Skip to content
Davis-Bacon

RI20260001 (Rev 2)

Coverage: Rhode Island • Bristol, Kent, Newport +2.

Published: Jan 30, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
MATERIAL HANDLER (Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)$49.91$36.63
BOILERMAKER$50.62$28.82
Bricklayer, Stonemason, Pointer, Caulker & Cleaner$46.86$29.14
Marble Setter, Terrazzo Worker & Tile Setter$46.54$30.34
Marble, Tile & Terrazzo Finisher$38.78$29.61
CARPENTER (Includes Soft Floor Layer)$47.88$30.50
Diver Tender$48.68$30.50
DIVER$60.83$30.50
Piledriver$41.53$29.35
WELDER$48.68$30.50
MILLWRIGHT$45.72$31.50
ELECTRICIAN$56.11$44.10
Teledata System Installer$42.09$10.45
ELEVATOR MECHANIC$64.52$38.43
es Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work) GROUP 1$51.30$29.95
GROUP 2$49.30$29.95
GROUP 3$44.92$29.95
GROUP 4$42.07$29.95
GROUP 5$48.35$29.95
GROUP 6$39.15$29.95
GROUP 7$33.15$29.95
GROUP 8$45.00$29.95
GROUP 9$48.92$29.95
Power Equipment Operator GROUP 1$50.57$29.95
GROUP 2$48.57$29.95
GROUP 3$48.35$29.95
GROUP 4$44.35$29.95
GROUP 5$41.50$29.95
GROUP 6$47.65$29.95
GROUP 7$47.22$29.95
GROUP 8$44.54$29.95
Fringes Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water) GROUP 1$46.45$29.95
GROUP 2$44.45$29.95
GROUP 3$39.15$29.95
GROUP 4$25.75$29.95
GROUP 5$33.15$29.95
GROUP 6$39.73$29.95
GROUP 7$43.43$29.95
GROUP 8$38.70$29.95
IRONWORKER$43.03$33.53
LABORER GROUP 1$37.00$26.90
GROUP 2$37.00$26.90
GROUP 3$37.00$26.90
GROUP 4$37.00$26.90
GROUP 5$39.00$26.90
LABORER COMPRESSED AIR Group 1$55.40$24.15
Group 2$52.93$24.15
Group 3$42.45$24.15
FREE AIR Group 1$46.00$24.15
Group 2$45.00$24.15
LABORER Group 1$33.05$24.05
Group 2$35.75$24.85
Group 3$36.50$24.85
Group 4$29.00$24.85
Group 5$37.50$24.85
OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW Bottom Man$41.50$24.15
Top Man & Laborer$35.60$24.15
TEST BORING Driller$41.95$24.15
Laborer$41.95$24.15
PAINTER Brush and Roller$39.57$26.60
Epoxy, Tanks, Towers, Swing Stage & Structural Steel$41.57$26.60
Spray, Sand & Water Blasting$42.57$26.60
Taper$38.82$25.80
Wall Coverer$38.57$25.80
GLAZIER$41.63$26.15
Painter (Bridge Work)$57.85$26.40
Sign Painter$24.79$13.72
CEMENT MASON/CONCRETE FINISHER$44.75$29.10
PLASTERER$45.52$29.43
Plumbers and Pipefitters$54.34$34.50
ROOFER$47.49$31.44
SPRINKLER FITTER$53.76$33.44
Sheet Metal Worker$44.42$41.94
TRUCK DRIVER GROUP 1$31.86$34.51
b GROUP 2$32.01$34.51
b GROUP 3$32.06$34.51
b GROUP 4$32.11$34.51
b GROUP 5$32.21$34.51
b GROUP 6$32.61$34.51
b GROUP 7$32.81$34.51
b GROUP 8$32.31$34.51
b GROUP 9$32.56$34.51
b GROUP 10$32.36$34.51

Related Wage Determinations

View directory →