UPGRADE PUMP STATION No. 1044 SUBMERSIBLE PUMPING STATION WITHOUT EMERGENCY GENERATOR
Federal opportunity from Strategic Procurement Department (SPD) • Miami-Dade County. Place of performance: FL. Response deadline: Jun 25, 2026.
- Source
- Open on official portal →
- Solicitation
- RPQ No P16116
- Performance
- Miami-Dade County, FL
- Response
- Jun 25, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 42 more rate previews.↓
Description
The project consists of furnishing all materials (except those listed in Section 4.00 “Materials and Equipment Furnished by The Department”), labor, equipment, tools and other facilities and services necessary for proper execution, testing, and completion of the work required to Upgrade Sewage Pump Station No. 1044. This includes, but is not limited to, site preparation, demolition work, installation of new structures, installation of mechanical and electrical equipment, and restoration of impacted areas. Site preparation may require clearing and grubbing prior to demolition and construction work. The Contractor shall provide uninterrupted by-pass pumping capabilities to have a flow and head capacity equal to or greater than the proposed pumps for the existing pump station flows during all construction time and until the new pump station is completely operational, tested, and accepted by the Owner and regulatory agencies (see by-pass requirements on Section 8.00 “Measurement and Payment”). The Contractor shall also be required to design, obtain approval, implement, and maintain a Maintenance of Traffic Plan (MOT) during construction activities, as required. MINIMUM REQUIREMENTS OF THE BIDDER A. License Requirements 1. At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and these Solicitation and Contract Documents, the Bidder must hold a valid, current, and active: a. Certificate of Competency from the County's Construction Trades Qualifying Board as a General Engineering Contractor or as a Pipeline Engineering Contractor. The Pipeline Engineering Contractor shall subcontract with a qualified contractor any work which is incidental to the pipeline specialty but is specified in the aforementioned Code as being the work of other than that of the Engineering Specialty for which certified; or b. Certification, as a General Contractor or as an Underground Utility and Excavation Contractor, provided by the State of Florida Construction Industry Licensing Board, pursuant to the provisions of Florida Statutes Chapter 489.115. Experience 1. In addition to the license requirements in Section 1.01, A above, the Bidder must have a minimum of three (3) years of experience, under its current business name (which can include the experience of key supervisory employees that would man the project), in the public right-of-way construction, installation, repair, and replacement of main water distribution systems or main sanitary sewer collection systems, or both, and maintenance of vehicular traffic, supported by references for three (3) projects completed within the past five (5) years. Submitted reference Projects must demonstrate that the Bidder served as the Prime Contractor for the referenced Projects provided. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.The project consists of furnishing all materials (except those listed in Section 4.00 “Materials and Equipment Furnished by The Department”), labor, equipment, tools and other facilities and services necessary for proper execution, testing, and completion of the work required to Upgrade Sewage Pump Station No. 1044. This includes, but is not limited to, site preparation, demolition work, installation of new structures, installation of mechanical and electrical equipment, and restoration of impacted areas. Site preparation may require clearing and grubbing prior to demolition and construction work. The Contractor shall provide uninterrupted by-pass pumping capabilities to have a flow and head capacity equal to or greater than the proposed pumps for the existing pump station flows during all construction time and until the new pump station is completely operational, tested, and accepted by the Owner and regulatory agencies (see by-pass requirements on Section 8.00 “Measurement and Payment”). The Contractor shall also be required to design, obtain approval, implement, and maintain a Maintenance of Traffic Plan (MOT) during construction activities, as required. MINIMUM REQUIREMENTS OF THE BIDDER A. License Requirements 1. At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and these Solicitation and Contract Documents, the Bidder must hold a valid, current, and active: a. Certificate of Competency from the County's Construction Trades Qualifying Board as a General Engineering Contractor or as a Pipeline Engineering Contractor. The Pipeline Engineering Contractor shall subcontract with a qualified contractor any work which is incidental to the pipeline specialty but is specified in the aforementioned Code as being the work of other than that of the Engineering Specialty for which certified; or b. Certification, as a General Contractor or as an Underground Utility and Excavation Contractor, provided by the State of Florida Construction Industry Licensing Board, pursuant to the provisions of Florida Statutes Chapter 489.115. Experience 1. In addition to the license requirements in Section 1.01, A above, the Bidder must have a minimum of three (3) years of experience, under its current business name (which can include the experience of key supervisory employees that would man the project), in the public right-of-way construction, installation, repair, and replacement of main water distribution systems or main sanitary sewer collection systems, or both, and maintenance of vehicular traffic, supported by references for three (3) projects completed within the past five (5) years. Submitted reference Projects must demonstrate that the Bidder served as the Prime Contractor for the referenced Projects provided. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.
Technical Certification: Building Contractor, General Building Contractor, Pipelines, Pipelines Engineering Contractor, Underground Utility/Excavation, General Engineering
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.