U.S. Embassy Antananarivo: Central Alarm Monitoring Services
Solicitation from STATE, DEPARTMENT OF • STATE, DEPARTMENT OF. Place of performance: Antananarivo, Antananarivo • 101 Madagascar. Response deadline: Apr 17, 2026. Industry: NAICS 561612 • PSC K063.
Market snapshot
Awarded-market signal for NAICS 561612 (last 12 months), benchmarked to sector 56.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 561612
Description
The vendor shall provide
- Alarm installation and maintenance services:
- One quote, for service provider owned alarm systems completely provided and maintained from the service provider; or
- One quote, for service provider owned communications modules to be installed in existing AES 5100 and 6100 systems. (This communications module must be able to communicate with service providers monitoring center.
- Provision of Central Alarm Monitoring System (CAMS) Monitoring Services. This is defined as an alarm system that also makes the intrusion known at another location by means of an automatic telephone dialer, wired connection or by radio transmission to a central monitoring location. CAMS must be monitored 24/7 and have a 24/7 dedicated response, i.e. Local Guard Mobile Patrol or a commercial security response company. The response service does not need to be armed with firearms.
RFQ# 19MA1026Q0006 is modify to include the following:
Housekeeping and Restoration:
The contractor shall:
- Patch, repair, and repaint all areas affected by the work (including walls, ceilings, trim, and door/window frames) so that surfaces match existing finishes and colors as closely as practicable.
- Ensure that no unused holes, openings, or exposed wiring remain and that all penetrations are properly sealed to maintain the integrity of the structure and security envelope.
- Remove any obsolete equipment, unused cabling, debris, and packaging, dispose of it in accordance with local regulations; no debris will be left on site.
- Clean up daily at the end of working hours. Trash may not be accumulated on site and must be removed from the site daily and disposed of properly and legally at a landfill, government‑regulated dump, or recycling center.
- Conduct a final walkthrough with Post security and facilities staff to verify proper operation/installation, cleanliness of work areas, and satisfactory restoration of all affected surfaces.
This is applicable to both:
Option 1: Communication and monitoring of existing alarm system
Option 2: Removal of existing alarm system and installation of new alarm system”.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.