CMR Water Treatment System Maintenance services contract
Solicitation from STATE, DEPARTMENT OF • STATE, DEPARTMENT OF. Place of performance: Djibouti, Djibouti • 185 Djibouti. Response deadline: Feb 28, 2026. Industry: NAICS 2213 • PSC L046.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 2213
Description
The United States Department of State (DOS) requires services at the unclassified clearance level, to provide water treatment maintenance services at the Chief of Mission Residence Compound, U.S. Embassy, Djibouti in accordance with the attached SOW. The water treatment systems to be maintained are as follows:
Domestic (Potable) Water Treatment System
The Overseas Buildings Operations (OBO) has a requirement to obtain water treatment maintenance services to execute this work, including logistics, customs, shipping, transportation, labor, water treatment chemicals, tools, water treatment testing kits/equipment, administrative and all associated management support functions. The water treatment service contract will include but not limited to combinations of physical methods, chemical methods, equipment servicing and testing to control water-related problems such as corrosion, scaling, general deposits, and microbiological fouling of the potable water systems. All work shall comply with the requirements described in the following, as a minimum:
- NSF Standards (National Sanitation Foundation)
- AWWA Standards (American Water Works Association) ANSI Standards
- SDS Regulations
- ASTM D
- NFPA Codes
- UL Standards
- IEEE Standards
- NEMA Standards
- OSHA Standards
- And all applicable manufacturer O&M and installation instructions/requirements
The purpose of this scope of work is to define the requirements for the planning, procurement, and maintenance of the potable water systems located at the CMR Compound. The intent of this service contract is to preserve the current piping, equipment, potable water systems, and establish a cost-effective water treatment program to control water related problems such as corrosion, scaling, general deposits, and microbiological fouling and meet water treatment goals. All work shall be executed in accordance with the project SOW attached, approved water treatment chemicals, associated contract documents and be compliant with all applicable safety, equipment and building codes and standards.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.