Painting and Siding at LPOE Building-Orient ME
Sources Sought from PUBLIC BUILDINGS SERVICE • GENERAL SERVICES ADMINISTRATION. Place of performance: ME. Response deadline: Apr 10, 2026. Industry: NAICS 238320 • PSC Z2AA.
Market snapshot
Awarded-market signal for NAICS 238320 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 20 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 238320
Description
General Service Administration (GSA) has found it necessary to remove and replace all vinyl siding on the main building of the LPOE along with the detached garage. Building shall be house wrapped with a weather tight breathable type material, a Hardi type cement board 4” lap reveal to match original historic siding shall be installed. All fascia, pillars, canopy ceiling, and any wood shall be scraped to remove old paint, lead paint safety precautions shall be used. Caulk all seams and joints where paint was removed and new siding was installed, paint all siding and where old paint was removed. ADA ramp, and median concrete shall be cleaned and epoxied. Paint railing on ADA ramp.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.