Skip to content
Department of Veterans Affairs

656-22-341 Conduct Substation Upgrade

Solicitation: 36C26326B0024
Notice ID: 7494aa9bc7a54c759ff2deafb97be732
TypeSolicitationNAICS 238210PSCY1NZSet-AsideSDVOSBCDepartmentDepartment of Veterans AffairsStateMNPostedApr 06, 2026, 12:00 AM UTCDueMay 11, 2026, 03:00 PM UTCCloses in 35 days

Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: MN. Response deadline: May 11, 2026. Industry: NAICS 238210 • PSC Y1NZ.

Market snapshot

Awarded-market signal for NAICS 238210 (last 12 months), benchmarked to sector 23.

12-month awarded value
$21,863,042
Sector total $37,048,826,276 • Share 0.1%
Live
Median
$134,842
P10–P90
$69,488$200,196
Volatility
Volatile97%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.1%
share
Momentum (last 3 vs prior 3 buckets)
+4616%($20,955,165)
Deal sizing
$134,842 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for MN
Live POP
Place of performance
Saint Cloud, Minnesota • 56303 United States
State: MN
Contracting office
Saint Paul, MN • 55101 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
MN20260044 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Minnesota • Crow Wing
Rate
ASBESTOS ABATEMENT WORKER
Base $36.23Fringe $22.26
Rate
BOILERMAKER
Base $41.39Fringe $28.82
+54 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 54 more rate previews.
Davis-BaconBest fitstate match
MN20260044 (Rev 0)
Open WD
Published Jan 02, 2026Minnesota • Crow Wing
Rate
ASBESTOS ABATEMENT WORKER
Base $36.23Fringe $22.26
Rate
BOILERMAKER
Base $41.39Fringe $28.82
Rate
BOOM TRUCK
Base $18.82Fringe $4.57
+53 more occupation rates in this WD
Davis-Baconstate match
MN20260102 (Rev 0)
Open WD
Published Jan 02, 2026Minnesota • Swift
Rate
ARTICULATED HAULER
Base $17.50Fringe $0.00
Rate
ASBESTOS ABATEMENT WORKER
Base $41.23Fringe $25.99
Rate
BLASTER
Base $21.33Fringe $9.01
+50 more occupation rates in this WD
Davis-Baconstate match
MN20260038 (Rev 0)
Open WD
Published Jan 02, 2026Minnesota • Chippewa
Rate
ARTICULATED HAULER
Base $24.00Fringe $6.00
Rate
ASBESTOS ABATEMENT WORKER
Base $41.23Fringe $25.99
Rate
BOILERMAKER
Base $48.35Fringe $31.93
+50 more occupation rates in this WD
Davis-Baconstate match
MN20260041 (Rev 0)
Open WD
Published Jan 02, 2026Minnesota • Clearwater
Rate
ASBESTOS ABATEMENT WORKER
Base $36.13Fringe $22.45
Rate
BOILERMAKER
Base $48.35Fringe $31.93
Rate
BOOM TRUCK
Base $44.54Fringe $26.88
+47 more occupation rates in this WD

Point of Contact

Name
Dwayne Brauch
Email
dwayne.brauch@va.gov
Phone
6512933039

Agency & Office

Department
VETERANS AFFAIRS, DEPARTMENT OF
Agency
VETERANS AFFAIRS, DEPARTMENT OF
Subagency
NETWORK CONTRACT OFFICE 23 (36C263)
Office
Not available
Contracting Office Address
Saint Paul, MN
55101 USA

More in NAICS 238210

Description

Base Project: The Contractor shall furnish all labor, materials, tools and equipment required to:

Remove and replace two large 5000KVA utility grade transformers with two 6000 KVA utility grade transformers.

Remove and replace a total of 16 smaller medium voltage transformers in the range of 30 KVA to 750 KVA.

Provide passive, anti-ram rated bollards in accordance with ASTM F2656 crash rating requirements (minimum M30/P1 or as directed by VA), installed per Specification Section 34 71 13. Bollards shall be placed a minimum of 3 feet from transformer pads, spaced no more than 5 feet apart, and removable where located within electrical working clearances, designed per project drawings.

Replace transformer pads, where required, with new pads meeting 4000 psi concrete strength and reinforcement per EK501 detail in the drawings.

All work completed in accordance with the specifications and contract drawings.

Deducts:

Bid Item I: (Alternate Deduct 1) 886 Calendar Days All Work of Bid Item I, less work to provide and install Transformer TF-50, as follows: Delete the furnishing and installation of install Transformer TF-50 as specified and indicated on the drawings.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.