- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
16--CONTROL PNL, ARS
Presolicitation from DEFENSE LOGISTICS AGENCY • DEPT OF DEFENSE. Place of performance: PA. Response deadline: Feb 24, 2026. Industry: PSC 1680.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 102 more rate previews.↓
Point of Contact
Agency & Office
Description
DIBBS / DLA Details
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This presolicitation notice from the Defense Logistics Agency pertains to the control panel (PNL) and ARS requirements under the PSC 1680 classification. Bidders should prepare for a competitive process focusing on technical capabilities and compliance with the military specifications.
The buyer aims to procure control panels for defense applications, ensuring reliability and adherence to military standards, with a focus on performance and maintenance support.
- Evaluate technical specifications for PNL & ARS controls
- Assess supply chain capabilities for timely deliverables
- Ensure compliance with military standards and regulations
- Prepare proposal documentation including pricing and technical approach
- Submit bids according to outlined timelines
- Statement of Work compliance
- Technical proposal with capabilities
- Pricing structure and cost breakdown
- Past performance documentation
- Certifications and compliance confirmations
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed technical requirements for the control panel and ARS
- Estimated budget for the procurement
- Permanent place of performance
- Specific evaluation criteria for proposals
- List of required certifications or qualifications
- Clarification on set-aside status
- Any additional performance metrics or KPIs expected
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.