Binghamton New York First Floor Buildout Solicitation
Solicitation from PUBLIC BUILDINGS SERVICE • GENERAL SERVICES ADMINISTRATION. Place of performance: NY. Response deadline: Apr 22, 2026. Industry: NAICS 236220 • PSC Z2AA.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 78 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 236220
Description
The General Services Administration (GSA), Public Buildings Service, Upstate Service District, intends to procure construction services for the build-out of the 1st Floor at the Binghamton Federal Building and U.S. Courthouse, located at 15 Henry Street, Binghamton, New York 13901.
Site Visit is scheduled for Tuesday, April 14, 2026.
This project involves the furnishing of all materials, equipment, labor, and supervision to complete the work described in the contract documents, including drawings and specifications developed by N.K. Bhandari Architecture & Engineering, P.C.
The total renovated space is approximately 3,015 Sq. Ft. and will be constructed as a Sensitive Compartmented Information Facility (SCIF). Base interior work includes, but is not limited to: demolition, abatement, new walls, hard ceiling, doors, casework, woodwork, flooring, plumbing, electrical, IT, fire protection, and mechanical work.
Qualification Requirements
Interested contractors must meet the following minimum qualifications:
- Experience: Minimum 8 years of successful experience in comparable projects (size, complexity, and scope).
- Past Performance:
- All three required past performance projects must have a minimum award value of $1,500,000.
- At least one of the three required past performance projects must be SCIF construction, performed as the General Contractor.
- Key Personnel Experience: The Project Manager and Superintendent must each have a minimum of 8 years of experience in their respective positions.
- Prohibition: The Company owner may not serve as the Project Manager.
Special Requirements
The contractor must adhere to the following special conditions:
- Security: All personnel must meet HSPD-12 security requirements and any additional customer agency requirements.
- Site Conduct: Cell phones and transmittal devices are prohibited on the project site.
- Scheduling: Loud or disruptive work must be performed off-hours at no additional cost to the Government.
- Coordination: The Contractor is responsible for coordinating all building shut-offs and roof penetrations with GSA Building Management and the Security Division Access Control (SDAC).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.