Miami University Student Athlete Accident Insurance
Federal opportunity from Miami University. Place of performance: OH. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
Please see the RFP attachments section for information for this event The purpose of this addendum is to provide responses to questions and documents requested. Please see attachments tab. 1. This request for proposals is for the selection of a vendor/provider to the University for services in accordance with the detailed specifications and requirements which follow. 2. Vendors desiring to respond to this Request for Proposals should submit an electronic copy of their response through the electronic sourcing portal at https://miamiu-ohiousourcing.ionwave.net/Login.aspx. In addition, specific questions regarding the RFP should be submitted through the portal. Responses to the vendors questions will be posted through the portal as well. 3. A list of exceptions, if any, describing any exceptions or deviations from the standards specified must accompany each item or service requested. Unless an exception to the specifications is clearly stated within your bid submission, the proposal will be expected to meet or exceed each specification, term, and condition. Any deviations from the minimum specifications will be evaluated by the end users. All proposals must be signed by an authorized agent of the seller. Prices, discounts or other financial considerations that address the requirements of this proposal described in the technical detailed section shall be fully enumerated in the response. 4. It is the responsibility of the respondent to ensure that all required documentation, as enumerated above, arrives on time and at the designated location. Any submissions received after the stated date and time, or those that do not contain the required information as enumerated above, or the correct number of copies, will be considered incomplete and unresponsive, and will be disqualified. 5. Award will be based on price and terms, delivery/availability, quality and durability, ease of use and suitability of project for the University's intended use, and judged reliability. References MUST be submitted in depth in an effort to determine satisfaction with operational performance and service. The proposal which offers the best combination of price, service, delivery time, quality, serviceability, and reliability, in the opinion of Miami University, will be selected.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.