Skip to content
Department of Defense

NOTICE OF INTENT - Sole Source Siemens HVAC Building Automation and Temperature Controls for the Chilled Water Plant Replacement and Utility Upgrades Project at the VA West Haven Campus

Solicitation: W912WJ26X1B65
Notice ID: 574d1bb31e384704a2fa75afde51f738
TypeSpecial NoticeDepartmentDepartment of DefenseAgencyDept Of The ArmyStateCTPostedFeb 04, 2026, 12:00 AM UTCDueFeb 18, 2026, 06:00 PM UTCExpired

Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: CT. Response deadline: Feb 18, 2026.

DoD CMMC Readiness
Modern compliance support by Federal Bid Partners

CMMC support options for this DoD solicitation

As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.

Done-for-you service
CMMC start-to-finish with FBP
$2,000
Registered Practitioner logo
Guided by a Registered Practitioner with practical DoD workflow support.
  • Gap review, remediation roadmap, and implementation support
  • Policy package, evidence mapping, and submission prep
  • Designed for primes and subs across non-tech and tech work
Start CMMC with Federal Bid Partners →
AI-powered application
CMMC Pulsar™ start-to-finish
$399
CMMC Pulsar logo
First-of-its-kind CMMC Pulsar™ app to run your CMMC workflow with AI assistance.
  • Structured checklist, AI guidance, and progress tracking
  • Build evidence and controls with clearer next-step workflows
  • Ideal for teams that want speed plus affordability
Open CMMC Pulsar™ →
Solicitation context: W912WJ26X1B65. Requirements vary by acquisition and contract type; COTS-only exceptions may apply.

Market snapshot

Awarded-market signal for this agency (last 12 months).

12-month awarded value
$16,182,386,182
Sector total $16,182,386,182 • Share 100.0%
Live
Median
$420,035
P10–P90
$39,707$60,263,933
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+35942%($16,092,689,207)
Deal sizing
$420,035 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for CT
Live POP
Place of performance
West Haven, Connecticut • United States
State: CT
Contracting office
Concord, MA • 01742-2751 USA

Point of Contact

Name
Tyler Maryak
Email
tyler.s.maryak@usace.army.mil
Phone
Not available
Name
Erin Bradley
Email
erin.e.bradley@usace.army.mil
Phone
Not available

Agency & Office

Department
DEPT OF DEFENSE
Agency
DEPT OF THE ARMY
Subagency
US ARMY CORPS OF ENGINEERS
Office
ENGINEER DIVISION NORTH ATLANTIC • ENDIST NEW ENGLAND • W2SD ENDIST NEW ENGLAND
Contracting Office Address
Concord, MA
01742-2751 USA

Description

Under the authority of FAR 6.103-1, the U.S. Army Corps of Engineers intends to require, on a sole source basis, a brand name requirement for the Siemens HVAC building automation and temperature controls systems in the Chilled Water Plant Replacement and Utility Upgrades Project at the VA West Haven Campus.

The existing VA West Haven campus utilizes Siemens Controls for the existing Combined Heat and Power (CHP) Plant. A New Boiler Plant project is being designed to use Siemens Controls. The new temperature controls system for the chiller plant will be connected to this system. Utilizing Siemens Controls will provide a single controls option for the overall campus steam and chilled water generating equipment. This will allow VA West Haven personnel to monitor the new chiller plant along with the remainder of the boiler plant and CHP plant at a single location.  

The Siemens Controls building automation system is a network of sensors, and control devices that provides the required infrastructure to control and monitor Mechanical, Electrical, Plumbing, and Telecommunications (MEPT) systems throughout the plants. The system’s ability to communicate and monitor devices is achieved by the proprietary nature of the network, which is common in the industry. For the system to work at an acceptable level of performance, fast and reliable communication among devices and annunciation of alarms must happen in seconds. When new MEPT systems are installed and spaces are created within the plants, the Siemens Control’s system must be expanded to ensure proper communication with the existing plant user interface. This procurement will require the installation of various equipment, including but not limited to the following: sensors, controllers, actuators, communication protocols, and user interfaces. Device quantities may change as design develops. Part numbers are not included as they have yet to be determined and they may change based on delegated design submittals. 

If Siemens HVAC building automation and temperature controls systems are not sole sourced, then the new chiller plant will not be connected to the utility plant-wide system, requiring installation of a separate stand-alone system. To achieve communications interconnection between systems, if doing so is possible, would require involvement from multiple system manufacturers and introduce significant complications to system functioning as well as any future system modifications.

THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE PROPOSALS. It is a market research tool being used to determine the availability of other qualified sources that can meet the requirements identified above and inherent with the referenced Siemens Controls system. The Government is not obligated to and will not pay for any information received from potential sources as a result of this notice of intent. All responses received within 15 days of the posting of this notice of intent will be considered by the Government. A determination by the Government to require the brand name for the Siemens Controls system for the Chilled Water Plant Replacement and Utility Upgrades procurement based on this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purposes of determining whether to allow alternate system manufacturers.

Submit responses within 15 days of the posting of this notice of intent via email to: tyler.s.maryak@usace.army.mil and CC erin.e.bradley@usace.army.mil (list "W912WJ26X1B65 – Siemens" in the subject line of the email).

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.