Skip to content
City of Lacey

Small Works Bids (By Invitation Only) | Long Lake Property Demolition

Solicitation: PW 2025-11
Notice ID: 54cd494af6943e8e608c9b7b5ea6af05
DepartmentCity of LaceyStateWAPostedFeb 25, 2026, 12:00 AM UTCDueMar 25, 2026, 12:00 AM UTCCloses in 9 days

Federal opportunity from City of Lacey. Place of performance: WA. Response deadline: Mar 25, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$902,926,256
Sector total $902,926,256 • Share 100.0%
Live
Median
$183,717
P10–P90
$25,989$2,550,765
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($902,926,256)
Deal sizing
$183,717 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
WA, US
State: US
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
WA20260104 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Washington • Columbia
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
+37 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 37 more rate previews.
Davis-BaconBest fitstate match
WA20260104 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Columbia
Rate
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
Base $75.37Fringe $18.82
Rate
TILE FINISHER
Base $27.26Fringe $11.99
Rate
TILE SETTER
Base $36.35Fringe $14.57
+36 more occupation rates in this WD
Davis-Baconstate match
WA20260130 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Spokane
Rate
ELECTRICIAN
Base $49.55Fringe $19.09
Rate
Line Construction: LINE PERSON
Base $64.17Fringe $23.58
Rate
TREE TRIMMER: Ground Person
Base $22.60Fringe $16.37
+31 more occupation rates in this WD
Davis-Baconstate match
WA20260021 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Adams
Rate
BRICKLAYER
Base $33.95Fringe $19.33
Rate
TILE SETTER
Base $29.86Fringe $13.95
Rate
CARPENTER (Including Drywall Hanging and Form Work)
Base $44.21Fringe $17.28
+28 more occupation rates in this WD
Davis-Baconstate match
WA20260061 (Rev 1)
Open WD
Published Jan 23, 2026Washington • Whitman
Rate
ELECTRICIAN
Base $49.55Fringe $19.09
Rate
Line Construction: LINEMEN
Base $60.54Fringe $23.97
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $38.17Fringe $23.40
+20 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Lacey
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Description

LONG LAKE PROPERTY DEMOLTION LACEY CONTRACT NUMBER PW 2025-11 This page intentionally left blank TABLE OF CONTENTS Invitation for Bids ................................................................................................................ i INSTRUCTIONS Instructions to Bidders .................................................................................................... A-1 Bidder's Checklist ........................................................................................................... A-2 BID DOCUMENTS Proposal & Bid Sheet .......................................................................................................B-1 Bid Deposit Selection .............................................

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.