Skip to content
Borough of Petersburg

INVITATION TO BID: SCOW BAY #2 SWITCHGEAR BID

Solicitation: Not available
Notice ID: 4c10b4930e1c4e26150e29666151f911
DepartmentBorough of PetersburgStateAKPostedApr 17, 2026, 12:00 AM UTCDueOct 09, 2025, 08:00 AM UTCExpired

Federal opportunity from Borough of Petersburg. Place of performance: AK. Response deadline: Oct 09, 2025.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for AK
Live POP
Place of performance
Petersburg, AK
State: AK
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
AK20260001 (Rev 0)
Match signal: state match • scope type matchOpen WD
Published Jan 02, 2026Alaska • Anchorage, Bethel, Bristol Bay +16
Rate
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems)
Base $41.35Fringe $16.46
Rate
TERIAL HANDLER (includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)
Base $37.38Fringe $19.55
+64 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 64 more rate previews.
Davis-BaconBest fitstate match • scope type match
AK20260001 (Rev 0)
Open WD
Published Jan 02, 2026Alaska • Anchorage, Bethel, Bristol Bay +16
Rate
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems)
Base $41.35Fringe $16.46
Rate
TERIAL HANDLER (includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)
Base $37.38Fringe $19.55
Rate
BOILERMAKER
Base $58.33Fringe $28.79
+63 more occupation rates in this WD
Davis-Baconstate match • scope type match
AK20260006 (Rev 0)
Open WD
Published Jan 16, 2026Alaska • Anchorage, Bethel, Bristol Bay +16
Rate
CARPENTER North of 63 Latitude
Base $50.79Fringe $26.32
Rate
South of N63 Latitude
Base $50.79Fringe $26.86
Rate
CEMENT MASON/CONCRETE FINISHER
Base $49.28Fringe $22.28
+35 more occupation rates in this WD
Davis-Baconstate match • scope type match
AK20260003 (Rev 0)
Open WD
Published Jan 02, 2026Alaska • Denali, Fairbanks North Star, Nome +3
Rate
POWER EQUIPMENT OPERATOR (1)Backhoe: 3 yards and under
Base $53.23Fringe $29.50
Rate
Bulldozer
Base $53.23Fringe $29.50
Rate
Mechanic
Base $53.23Fringe $29.50
+11 more occupation rates in this WD
Davis-Baconstate match • scope type match
AK20260004 (Rev 0)
Open WD
Published Jan 02, 2026Alaska • Anchorage
Rate
CARPENTER (excluding drywall hanging and batt and blown insulation)
Base $15.85Fringe $0.00
Rate
including cement finishing)
Base $21.30Fringe $0.00
Rate
ELECTRICIAN
Base $22.99Fringe $0.00
+7 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Borough of Petersburg
Agency
Not available
Subagency
Not available
Office
Administration
Contracting Office Address
Not available

Description

INVITATION TO BID: SCOW BAY #2 SWITCHGEAR BID Bid/RFP Status: Closed - no longer accepting bids and proposals Bid/RFP Due Date: Thursday, October 9, 2025 - 3:30pm Back to Bids/RFPs Scope of Procurement The Petersburg Borough, dba Petersburg Municipal Power and Light, is seeking bids to procure 11kV switchgear for Scow Bay Generator #2. This procurement generally consists of furnishing a specification compliant set of 11kV Metalclad Switchgear and shipping it to Petersburg Alaska. Switchgear technical specifications can be obtained from the Petersburg Power and Light department, 11 South Nordic Drive, for a fee of $20.00 or the project documents may be downloaded below at no charge. All contractors must complete the Contractor Notification Form . Downloading Contract Documents from the Petersburg Borough website requires completing a bid advertisement form to receive changes or addenda. Estimate for the procurement: $200,000 - $300,000. Submittal Information Mail sealed bids to: Petersburg Borough, Scow Bay Gen 2 Switchgear ATTN: Karl Hagerman, Utility Director 11 S. Nordic Drive/ PO Box 329 Petersburg, AK 99833 Sealed bids will be accepted until Thursday, October 9, 2025 - 3:30pm , at the Petersburg Power and Light Building at 11 S. Nordic Drive in Petersburg. The bids will be opened publicly in the Power and Light conference room immediately following this deadline. Bids submitted electronically will not be accepted, however bid modifications will be accepted up until the bid opening by emailing to khagerman@petersburgak.gov . Bid modifications shall not divulge the total bid price but shall only indicate the adjustment to be made to the sealed bid. The bidder awarded this procurement will be issued a purchase order that references the technical specifications and the offeror’s bid proposal in order to proceed. Questions regarding the procurement should be directed to Karl Hagerman at 907-772-5421. Authorized by Stephen Giesbrecht, Borough Manager Supporting Documents Scow Bay #2 Switchgear Bid Tabulation (638 KB) Addendum 1 Scow Bay Gen 2 Switchgear (103 KB) Invitation to Bid Scow Bay Generator #2 Switchgear (113 KB) Scow Bay Generator #2 Switchgear Bid Documents and Specifications (2 MB) Power & Light About Us Pay Your Utility Bill Utility Accounts Electric Rates Building Permits & Inspections Energy Assistance & Rebate Programs Call Before You Dig Medical Call List Report an Issue Contact Information Petersburg Municipal Power & Light 11 South Nordic Drive PO Box 329 Petersburg, Alaska 99833 General Inquiries View Full Contact Details

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.