- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
FY26 Concert Production Support
Solicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: TX. Response deadline: Mar 31, 2026. Industry: NAICS 71 • PSC R799.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 51 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 71
Description
Air Force Entertainment (AFE) LIVE STAGE will produce concerts at six (6) Air Force Installations during 2026. Due to the magnitude of the event, AFE requires a production company to support each concert by augmenting AFE assets and personnel to meet artist’s performance requirements. The Air Force Nonappropriated Fund Procurement Office (AFNAFPO) intends to award a Firm-Fixed Price contract to the offeror whose quote is the Lowest Price Technically Acceptable (LPTA).
The 2026 Entertainment Program is scheduled to begin on 13 Jul 2026 and continue through 30 Sep 2026. The Contractor will advance all artists scheduled to perform concerts and identify total requirements for providing production support for each concert. The Contractor will then meet with the AFE Technical Director to ensure ability to support identified requirements and validate interfacing of AFE and Contractor equipment necessary to support each requirement. The Contractor will provide all technical equipment, personnel and transportation listed in Part II. AFE will provide their equipment identified as well as any additional equipment required to meet artist’s production riders not listed to be supplied by the Contractor. The Contractor supplied technical personnel must possess the skill and professional expertise to be fully capable of transporting, setting up, operating and tearing down the complete Audio, Video, Lighting and Staging Systems identified within this Statement of Work. They must be capable of passing standard base entry security requirements and adhering to all host base protocols.
6 Air Force Installations
Summer Heat #1:
18 Jul - Fairchild AFB, WA
25 Jul - Malmstrom AFB, MT
Summer Heat #2:
15 Aug - Buckley SFB, CO
22 Aug - Ellsworth AFB, SD
Summer Heat #3:
12 Sep - JB MDL, NJ
19 Sep - JB LE, VA
"Please submit questions concerning the Statement of Work (SOW) in writing to the Contract Specialist listed below no later than (NLT) 5:00 PM, CST, 26 March 2026. "
This is a nonappropriated fund purchase and it does not obligate appropriated funds of the United States Government. Nonappropriated funds are generated by the military community through the sale of goods and services and the collection of fees and charges for participation in military community programs. This purchase does not involve federal tax dollars.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.