Skip to content
Department of Transportation

Construction of New Airport Traffic Control Tower (ATCT) - Grand Forks, ND

Solicitation: 697DCK-26-R-00034
Notice ID: 43e1bb9ebd614e94bbc3b5b851ed5faf

Solicitation from FEDERAL AVIATION ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: ND. Response deadline: Mar 02, 2026. Industry: NAICS 236220 • PSC Y1BA.

Market snapshot

Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.

12-month awarded value
$26,069,663,898
Sector total $33,071,130,462 • Share 78.8%
Live
Median
$412,000
P10–P90
$0$99,000,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
78.8%
share
Momentum (last 3 vs prior 3 buckets)
+74621%($25,999,978,522)
Deal sizing
$412,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for ND
Live POP
Place of performance
Grand Forks, North Dakota • 58203 United States
State: ND
Contracting office
Fort Worth, TX • 76177 USA

Point of Contact

Name
Erin Crabtree
Email
erin.m.crabtree@faa.gov
Phone
Not available

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
FEDERAL AVIATION ADMINISTRATION
Subagency
697DCK REGIONAL ACQUISITIONS SVCS
Office
Not available
Contracting Office Address
Fort Worth, TX
76177 USA

More in NAICS 236220

Description

The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower (ATCT) and Base Building at the Grand Forks International Airport in Grand Forks, ND. 

This solicitation is posted in accordance with FAA Acquisition Management Policy Section 3.2.1.3.11 Public Announcement. Review all attachments pertaining to this solicitation prior to submitting a proposal. This announcement is not intended to guarantee procurement of the services and shall not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses to this announcement and will not reimburse any vendors for cost incurred in responding to this public announcement.

The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Erin.M.Crabtree@faa.gov.

Attachment J-1 Statement of Work

Attachment J-2 Specifications - Division I

Attachment J-2 Specifications - Division II

Attachment J-2a Drawings

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.