7A--GoldSim Pro with Radionuclide Transport Module and GoldSim Pro with DP Plus
Presolicitation from NUCLEAR REGULATORY COMMISSION • NUCLEAR REGULATORY COMMISSION. Place of performance: {"city":{},"state":{},"country":{}}. Response deadline: Feb 11, 2026. Industry: NAICS 513210 • PSC 7A20.
Market snapshot
Awarded-market signal for NAICS 513210 (last 12 months), benchmarked to sector 51.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 513210
Description
This proprietary software has a full range of requirements for performing highly flexible performance assessment modeling of complex decommissioning sites and proposed high-level waste repository sites. The GoldSim developed software has a model file format that is proprietary and can only be viewed, executed, and edited using the appropriate GoldSim software. The NRC has no other means of obtaining this software because GoldSim Technology Group, LLC, does not allow any other distributor to provide the upgrade and/or maintenance to their propriety software.
This noncompetitive acquisition is conducted under the authority of FAR 6.103-1. Only one responsible source and no other supplies or services will satisfy agency requirements
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.