Baseline Road at Dry Creek Bridge Replacement
Federal opportunity from Boulder County. Place of performance: CO. Response deadline: Mar 12, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 51 more rate previews.↓
Point of Contact
Agency & Office
Description
Boulder County and its partners have funding to provide existing culvert upgrades as a part of their reoccurring capital improvements projects. The proposed work includes, but is not limited to, earthwork and erosion control, removal and milling of asphalt pavement, overlay and full depth asphalt replacement, culvert removal and replacement, channel improvements, wetland mitigation, coordination with private utility companies for underground utility relocations, signing, striping, earthwork and grading, seeding, fencing, guardrail replacement, and storm drainage facilities. If you have any questions about the Boulder County procurement process, please email procurement@bouldercounty.gov . Americans with Disabilities Act and Equal Opportunity Notice
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.