Construct EHRM Infrastructure Upgrades - Philadelphia, PA
Solicitation from VETERANS AFFAIRS, DEPARTMENT OF • VETERANS AFFAIRS, DEPARTMENT OF. Place of performance: PA. Response deadline: May 29, 2026. Industry: NAICS 236220 • PSC Y1DA.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 96 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 236220
Description
PROJECT DESCRIPTION
The awarded Contractor shall complete all construction work detailed by the 100% bid design
drawings, specifications, and project manual included in this solicitation, prepared by the A/E
Health Facilities Solutions. Campus buildings impacted by the upgrades include Buildings 1, 2,
3, 21, and 30. Upgrades in these buildings shall include existing rooms and telecommunication
closets and include relocation, reconfiguration, expansion, and renovation involving new walls,
doors and finishes, etc. throughout each space. Construction work shall also comply with VA
“Infrastructure Standard for Telecommunications Spaces (ISTS) V4.0, June 1, 2023. Bid work
shall include General Construction (and associated trades), Structural, Mechanical and HVAC,
Plumbing and Fire Protection, Electric, and Information Technology, Civil. The VA Physical
Security Design and Resiliency Manual (PDRSM) requirements shall be incorporated into the
construction of the project.
The project work areas will be occupied by staff or patients during construction. Work shall not
be allowed between the hours of 5am – 5pm ET. All materials and equipment must be moved to
the work areas after staff/patients have vacated after 5pm each day. All materials and
equipment must be removed from the work areas, dust and debris cleared, and work completed
or returned to typical conditions prior to 5am each day. Project phasing shall be required as not
all work areas will be available for construction concurrently. In summation, available work hours
are from 5pm – 5am ET.
Site visit prior to bid shall be required to ensure contractor has an understanding of existing
conditions.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.