Skip to content
J

Concession Trailer Bid

Solicitation: Not available
Notice ID: 21d0a3ff9e8584edf223be039df35170
DepartmentJStateILPostedJun 15, 2025, 12:00 AM UTCDueJun 30, 2026, 04:00 AM UTCCloses in 36 daysBid range$263,959 - $312,841
Contract snapshot

Federal opportunity from J. Sterling Morton High School District 201. Place of performance: IL. Response deadline: Jun 30, 2026.

Source
Open on official portal →
Solicitation
21d0a3ff9e8584edf223be039df35170
Performance
IL, US
Response
Jun 30, 2026, 04:00 AM UTC
Open on official portal →
Live POP
Place of performance
IL, US
State: US
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
J. Sterling Morton High School District 201
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
IL20260033 (Rev 2)
Published May 18, 2026Illinois • Wayne
11 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 9 more rate previews.
Davis-BaconBest fitstate match
IL20260033 (Rev 2)
Open WD
Published May 18, 2026Illinois • Wayne
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
CARPENTER (INCLUDING DRYWALL AND BATT INSULATION)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN (WORK NOT TO EXCEED 8-PLEX FAMILY HOUSING UNITS)
Base $32.58Fringe $12.11
+8 more occupation rates in this WD
Davis-Baconstate match
IL20260011 (Rev 1)
Open WD
Published May 18, 2026Illinois • Boone, De Kalb, Du Page +5
Rate
CARPENTER: HEAVY & HIGHWAY (DUPAGE ANE LAKE COUNTIES)
Base $52.01Fringe $38.85
Rate
CARPENTER: BUILDING (DUPAGE ANE LAKE COUNTIES)
Base $52.01Fringe $38.85
Rate
CARPENTER AND PILEDRIVER (WILL COUNTY)
Base $49.76Fringe $38.26
+96 more occupation rates in this WD
Davis-Baconstate match
IL20260019 (Rev 1)
Open WD
Published May 18, 2026Illinois • Adams, Alexander, Bond +99
Rate
above all current established wage rates, including those rates to which other premiums are applicable
Base $37.65Fringe $34.21
Rate
above all current established wage rates, including those rates to which other premiums are applicable
Base $36.59Fringe $31.75
Rate
above all current established wage rates, including those rates to which other premiums are applicable
Base $38.57Fringe $31.75
+9 more occupation rates in this WD
Davis-Baconstate match
IL20260030 (Rev 2)
Open WD
Published May 18, 2026Illinois • Jersey
Rate
BUT EXCLUDING MULTI-BUILDING APARTMENT COMPLEXES OR APARTMENT BUILDINGS THAT HAVE COMMERCIAL STORES OR PROFESSIONAL QUARTERS IN CONJUNCTION WITH COMMERCIAL VENTURES SUCH AS NURSING HOMES, MOTELS, INC.)
Base $30.49Fringe $8.58
Rate
UT MACHINES REGARDLESS OF SIZE, NAIL LAUNCHERS WHEN MOUNTED ON A MACHINE OR SELF-PROPELLED, CON-COVER MACHINES, GOLDHOFER AND SIMILAR S.P.M.T. (SELF-PROPELLED MODULAR TRANSPMIERS) HEAVY TRANSPORT UNITS
Base $40.95Fringe $34.95
Rate
PREMIMUM
Base $31.39Fringe $21.58
+5 more occupation rates in this WD

Description

".STERLING MORTON HSD 201\nINVITATION TO BID\n\nCONCESSION TRAILER\n\nBid Opening Date: Monday June 30%, 2025\nBid Opening Time: 11:00 AM\n\nBid Opening Location: J. Sterling Morton HSD 201\nDistrict Office\n5801 W. Cermak Rd\nCicero, Illinois 60804\n\n" "INSTRUCTIONS AND GENERAL CONDITIONS\n\nl. Sealed proposals shall be delivered to the District Office at any time prior to, but not later\nthan 11:00 a.m. local time on June 30%, 2025. Each bid must be submitted in a sealed\nenvelope. All bids must be signed by an authorized representative of the firm submitting\nthe bid.\n\n2. The School District cannot assume theresponsibility for delayed postal deliveries and does\nnot recognize postmarks as representing the fact that a bid ...

Advisory bid range

Pricing and bid posture

high confidence
$263,959 - $312,841

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$263,959
Target
$279,322
Premium
$312,841
Labor
$13,680
Direct
$183,000
Burden
$29,383
Fee + reserve
$32,919
Target $279,322Hybrid workpaper with explicit assumptions3 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.