Skip to content
Narragansett Bay Water Quality District Commission

Circuit Breakers

Solicitation: Not available
Notice ID: 1fa685daa8ac3734b4f78c6c31f943c8
DepartmentNarragansett Bay Water Quality District CommissionStateRIPostedMar 04, 2026, 12:00 AM UTCDueMar 18, 2026, 02:00 PM UTCCloses in 14 days

Federal opportunity from Narragansett Bay Water Quality District Commission • Narragansett Bay Water Quality District Commission. Place of performance: RI. Response deadline: Mar 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,261,759,290
Sector total $3,261,759,290 • Share 100.0%
Live
Median
$275,770
P10–P90
$32,298$4,646,416
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,261,759,290)
Deal sizing
$275,770 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Rhode Island
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 30, 2026
Rhode Island • Bristol, Kent, Newport +2
MATERIAL HANDLER (Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)
Base: $49.91 • Fringe: $36.63
BOILERMAKER
Base: $50.62 • Fringe: $28.82
Bricklayer, Stonemason, Pointer, Caulker & Cleaner
Base: $46.86 • Fringe: $29.14
Match signal: state match
Published Jan 30, 2026
Rhode Island • Newport
ROOFER
Base: $47.49 • Fringe: $31.44
BRICKLAYER
Base: $21.70 • Fringe: $10.85
CARPENTER Including Drywall Hanging Metal Stud Framing, Form Setting, Batt Insulation, Downspouts & Gutter Installation
Base: $12.95 • Fringe: $5.51
Match signal: state match
Published Jan 30, 2026
Rhode Island • Bristol, Kent, Providence +1
ELECTRICIAN
Base: $42.09 • Fringe: $5.41
ELEVATOR MECHANIC
Base: $64.52 • Fringe: $38.43
Power Equipment Operator Grader and Roller
Base: $39.90 • Fringe: $28.25
Match signal: state match
Published Jan 30, 2026
Rhode Island • Bristol, Kent, Newport +2
Dredging: CLASS A1
Base: $48.48 • Fringe: $15.34
b CLASS A2
Base: $43.20 • Fringe: $14.99
b CLASS B1
Base: $41.93 • Fringe: $14.90
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
Narragansett Bay Water Quality District Commission
Agency
Narragansett Bay Water Quality District Commission
Subagency
Narragansett Bay Water Quality District Commission
Office
Division of Purchases
Contracting Office Address
Not available

Description

See narrabay.com for specifications and addendums

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.