Gatesville ISD Synthetic Track Removal & Replacement
● Remove existingtrack surfacing system from track oval D-zone and one long jump runway anddispose of off site ● Provide andinstall approximately 5,800 SY of epiQ Tracks S200 black 13mm permeable pavedmat, or equivalent, and structural spray polyurethane surfacing system on thetrack…