Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

9,608 records • Page 59 of 401
DBA
4,106
SCA
1,404
CBA
4,098
Active
9,608
With Rates
5,486
With Benefits
1,404
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Minnesota • McLeod
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
PIPEFITTER/STEAMFITTER
$53.48 + $36.96 fringe
HEATING AND FROST INSULATORS
$53.19 + $31.95 fringe
Published Jan 02, 2026
Montana • Sheridan
ELEVATOR MECHANIC
$67.61 + $38.43 fringe
MILLWRIGHT
$46.21 + $23.50 fringe
PLUMBER/PIPEFITTER (Excluding HVAC Pipe Installation)
$44.35 + $21.87 fringe
Published Jan 02, 2026
Minnesota • Martin
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$53.19 + $31.95 fringe
POWER EQUIPMENT OPERATOR: (Commercial Group 1)
$51.03 + $26.40 fringe
Published Jan 02, 2026
Michigan • Monroe
OPERATOR: Power Equipment GROUP 1
$51.29 + $25.35 fringe
GROUP 2
$48.79 + $25.35 fringe
GROUP 3
$48.29 + $25.35 fringe
Published Jan 02, 2026
Virginia • Mecklenburg
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
Montana • Toole
LINE CONSTRUCTION (1) Lineman
$48.65 + $9.40 fringe
TRUCK DRIVER (2) Dump Truck ZONE A
$45.28 + $13.40 fringe
Dump Truck ZONE A
$45.28 + $13.40 fringe
Published Jan 02, 2026
Kentucky • Boone
POWER EQUIPMENT OPERATOR (Backhoe/Excavator/Trackhoe)
$44.14 + $16.41 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$41.55 + $19.60 fringe
ELECTRICIAN
$40.96 + $22.44 fringe
Published Jan 02, 2026
Virginia • Nottoway
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
Virginia • Prince Edward
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
West Virginia • Doddridge, Tyler
ELECTRICIAN
$42.20 + $20.39 fringe
POWER EQUIPMENT OPERATOR: GROUP 1
$41.95 + $20.45 fringe
GROUP 2
$39.19 + $20.45 fringe
Published Jan 02, 2026
Virginia • Augusta
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Idaho • Bear Lake, Caribou, Clark +5
CEMENT MASON/CONCRETE FINISHER
$40.89 + $18.64 fringe
OPERATOR: Mechanic
$26.91 + $10.22 fringe
CARPENTER (Form Work Only)
$26.57 + $8.10 fringe
Published Jan 02, 2026
Michigan • St Clair
ELEVATOR MECHANIC
$65.01 + $38.43 fringe
OPERATOR: Power Equipment GROUP 1
$51.29 + $25.35 fringe
GROUP 2
$49.79 + $25.35 fringe
Published Jan 02, 2026
Maine • Waldo
POWER EQUIPMENT OPERATOR: Grader/Blade, Milling Machine, Paver (Asphalt, Aggregate, and Concrete), Roller Asphalt
$30.17 + $13.80 fringe
OPERATOR: Mechanic
$22.07 + $8.73 fringe
OPERATOR: Bobcat/Skid Steer/Skid Loader
$21.66 + $4.91 fringe
Published Jan 02, 2026
Virginia • Franklin
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Frederick
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Michigan • Ottawa
OPERATOR: Power Equipment Backhoe/Excavator; Bulldozer; Grader/Blade; Loader; Scraper
$41.28 + $25.25 fringe
PIPEFITTER (HVAC Pipe Installation Only)
$39.89 + $23.82 fringe
PLUMBER (Excluding HVAC Pipe Installation)
$37.09 + $22.52 fringe
Published Jan 02, 2026
Virginia • Henrico
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Drill
$24.66 + $0.00 fringe
Published Jan 02, 2026
Kansas • Norton
ELEVATOR MECHANIC
$60.69 + $38.43 fringe
SHEET METAL WORKER (Excludes HVAC Duct and Unit Installation)
$52.18 + $27.15 fringe
PIPEFITTER (Excludes HVAC Pipe and Unit Installation)
$45.90 + $19.94 fringe
Published Jan 02, 2026
Massachusetts • Barnstable, Berkshire, Bristol +8
ELEVATOR MECHANIC
$74.17 + $38.43 fringe
PLUMBER
$69.84 + $36.43 fringe
Pipefitter including HVAC work
$66.58 + $39.22 fringe
Published Jan 02, 2026
Washington • Chelan
HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems)
$75.37 + $18.82 fringe
ELEVATOR MECHANIC
$67.61 + $38.43 fringe
of boom including jib with attachments
$62.47 + $27.57 fringe
Published Jan 02, 2026
Virginia • Prince George
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Drill
$24.66 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.