Davis-Bacon
UT20260097 (Rev 0)Published Jan 02, 2026
Utah • Salt Lake, Tooele
LINE CONSTRUCTION (Lineman)
$58.83 + $8.35 fringe
POWER EQUIPMENT OPERATOR (Mechanic)
$33.04 + $16.09 fringe
POWER EQUIPMENT OPERATOR (LOADER)
$31.99 + $17.64 fringe
Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.