Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

11,162 records • Page 212 of 466
DBA
4,106
SCA
2,918
CBA
4,138
Active
11,162
With Rates
0
With Benefits
2,917
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Florida • Holmes
ELECTRICIAN
$33.50 + $13.85 fringe
OPERATOR: Crane 100 Tons & Over (Conventional & Hydraulic) & Tower Cranes
$32.75 + $14.55 fringe
IRONWORKER, STRUCTURAL AND REINFORCING
$32.00 + $18.77 fringe
Published Jan 02, 2026
Florida • Jackson
OPERATOR: Crane 100 Tons & Over (Conventional & Hydraulic) & Tower Cranes
$32.75 + $14.55 fringe
IRONWORKER, STRUCTURAL AND REINFORCING
$32.00 + $18.77 fringe
Under 100 Tons
$30.25 + $14.55 fringe
Published Jan 02, 2026
Florida • Lafayette
Tower Crane; Locomotive Crane; Crawler Crane; Truck Crane; & Hydro Crane
$35.41 + $13.60 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$31.64 + $15.98 fringe
Published Jan 02, 2026
Florida • Levy
ft boom
$39.01 + $16.85 fringe
Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes
$38.01 + $16.85 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
Published Jan 02, 2026
Florida • Madison
Tower Crane; Locomotive Crane; Crawler Crane; Truck Crane; & Hydro Crane
$35.41 + $13.60 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$31.64 + $15.98 fringe
Published Jan 02, 2026
Florida • Putnam
Tower Crane; Locomotive Crane; Crawler Crane; Truck Crane; & Hydro Crane
$35.41 + $13.60 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$31.64 + $15.98 fringe
Published Jan 02, 2026
Georgia • Hall
OPERATOR: Crane
$25.45 + $0.00 fringe
OPERATOR: Backhoe/Excavator/Trackhoe
$24.17 + $4.70 fringe
CARPENTER
$21.64 + $3.90 fringe
Published Jan 02, 2026
Nebraska • Cass, Douglas, Sarpy +1
Lineman: Douglas County only
$47.07 + $22.51 fringe
LINE CONSTRUCTION Groundman
$30.45 + $22.51 fringe
Douglas County
$28.60 + $11.79 fringe
Published Jan 02, 2026
Florida • Suwannee
Tower Crane; Locomotive Crane; Crawler Crane; Truck Crane; & Hydro Crane
$35.41 + $13.60 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$31.64 + $15.98 fringe
Published Jan 02, 2026
Florida • Taylor
Tower Crane; Locomotive Crane; Crawler Crane; Truck Crane; & Hydro Crane
$35.41 + $13.60 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$31.64 + $15.98 fringe
Published Jan 02, 2026
Florida • Union
Tower Crane; Locomotive Crane; Crawler Crane; Truck Crane; & Hydro Crane
$35.41 + $13.60 fringe
ELECTRICIAN
$33.50 + $13.85 fringe
SHEET METAL WORKER (Includes HVAC Duct Installation)
$31.64 + $15.98 fringe
Published Jan 02, 2026
Florida • Bradford
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Texas • Grayson
PIPEFITTER (Excludes HVAC Pipe Installation)
$39.76 + $14.04 fringe
PLUMBER (HVAC Pipe Installation Only)
$39.76 + $14.04 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe and Mechanical System Insulation)
$33.23 + $7.52 fringe
Published Jan 02, 2026
Virginia • Stafford
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Kentucky • Nelson
LINE CONSTRUCTION: Lineman
$45.78 + $20.22 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$41.55 + $19.60 fringe
ELECTRICIAN
$40.96 + $22.44 fringe
Published Jan 02, 2026
Florida • Columbia
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Florida • De Soto
CARPENTER
$15.83 + $0.00 fringe
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$13.96 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Georgia • Fulton
OPERATOR: Crane
$39.31 + $0.00 fringe
CARPENTER
$32.68 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$30.37 + $0.00 fringe
Published Jan 02, 2026
Florida • Flagler
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
CARPENTER, Excludes Drywall Hanging
$13.93 + $0.00 fringe
Published Jan 02, 2026
Texas • Deaf Smith, Hall
OPERATOR: Bulldozer
$14.25 + $0.00 fringe
OPERATOR: Backhoe/Trackhoe
$13.86 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$13.00 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.