Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

11,139 records • Page 199 of 465
DBA
4,106
SCA
2,895
CBA
4,138
Active
11,139
With Rates
0
With Benefits
2,894
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Minnesota • Rock
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
Piledriver (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)
$49.46 + $30.23 fringe
Published Jan 02, 2026
Florida • Columbia
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Florida • Flagler
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
CARPENTER, Excludes Drywall Hanging
$13.93 + $0.00 fringe
Published Jan 02, 2026
Illinois • Ford, Grundy, Iroquois +7
OPERATOR: Power Equipment Group 1
$63.00 + $51.00 fringe
Group 2
$62.45 + $51.00 fringe
Lineman and Equipment Operator
$62.10 + $60.05 fringe
Published Jan 02, 2026
Ohio • Miami
ELEVATOR MECHANIC
$57.41 + $38.43 fringe
PIPEFITTER (Excludes HVAC Pipe Installation)
$51.00 + $32.56 fringe
SPRINKLER FITTER (Fire Sprinklers)
$48.28 + $28.08 fringe
Published Jan 02, 2026
Tennessee • Davidson
ELEVATOR MECHANIC
$52.81 + $38.43 fringe
PLUMBER
$46.02 + $19.63 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR
$38.17 + $18.82 fringe
Published Jan 02, 2026
Florida • Hardee
CARPENTER
$15.83 + $0.00 fringe
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$13.96 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Florida • Hendry
CARPENTER
$15.83 + $0.00 fringe
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$13.96 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Florida • Lafayette
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
New York • Genesee
OPERATOR: Backhoe/Excavator/Trackhoe
$43.97 + $24.17 fringe
ELECTRICIAN (Includes Low Voltage Wiring)
$42.50 + $27.23 fringe
PIPEFITTER (Includes HVAC Pipe Installation)
$42.20 + $29.80 fringe
Published Jan 02, 2026
Florida • Okeechobee
CARPENTER
$15.83 + $0.00 fringe
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$13.96 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Idaho • Boise
POWER EQUIPMENT OPERATOR: Bulldozer GROUP 8
$37.58 + $16.10 fringe
LABORER: Pipelayer
$28.48 + $13.00 fringe
OPERATOR: Rotomill
$28.05 + $10.00 fringe
Published Jan 02, 2026
Massachusetts • Essex
ELECTRICIAN
$66.17 + $37.08 fringe
OPERATOR: Forklift
$64.67 + $0.00 fringe
IRONWORKER (ORNAMENTAL AND STRUCTURAL)
$57.87 + $37.67 fringe
Published Jan 02, 2026
Georgia • Catoosa, Dade, Floyd +1
OPERATOR: Crane
$39.31 + $0.00 fringe
CARPENTER
$32.68 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$28.44 + $0.00 fringe
Published Jan 02, 2026
Florida • Levy, Suwannee, Union
GLAZIER
$28.78 + $14.33 fringe
INSULATOR: Batt and Blown
$14.70 + $0.00 fringe
OPERATOR: Backhoe
$13.92 + $0.00 fringe
Published Jan 02, 2026
Utah • Uintah
SHEET METAL WORKER (HVAC Duct Installation Only)
$46.79 + $14.89 fringe
BOILERMAKER
$44.37 + $26.87 fringe
SPRINKLER FITTER (Fire Sprinklers)
$42.17 + $26.63 fringe
Published Jan 02, 2026
Nebraska • Johnson, Nemaha, Otoe +2
CARPENTER
$8.52 + $0.00 fringe
ELECTRICIAN
$7.90 + $0.00 fringe
Power equipment operators: Bulldozer
$7.88 + $0.00 fringe
Published Jan 02, 2026
Tennessee • Marion
ELECTRICIAN
$35.35 + $14.63 fringe
Operating Engineers: Bulldozer and Crane
$33.23 + $13.40 fringe
Forklift
$30.44 + $13.40 fringe
Published Jan 02, 2026
Arkansas • Montgomery
OPERATOR: Paver (Asphalt, Aggregate, and Concrete)
$24.70 + $0.00 fringe
OPERATOR: Bobcat/Skid Steer/Skid Loader
$21.60 + $0.00 fringe
OPERATOR: Milling Machine
$20.95 + $0.00 fringe
Published Jan 02, 2026
Florida • Walton, Washington
OPERATOR: Backhoe
$13.92 + $0.00 fringe
PLUMBER
$13.00 + $0.00 fringe
OPERATOR: Loader
$12.00 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.