Davis-Bacon
CT20260016 (Rev 1)Published Jan 23, 2026
Connecticut • New Haven
Power equipment operators: GROUP 1
$58.19 + $29.80 fringe
Crane handling or erecting structural steel or stone
$58.19 + $29.80 fringe
GROUP 2
$57.78 + $29.80 fringe
Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.