Skip to content
Davis-Bacon

WI20260013 (Rev 0)

Coverage: Wisconsin • Pierce, St Croix.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
aterial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$55.34$34.03
BOILERMAKER Boilermaker$46.52$34.63
Bricklayer & Tile Setter$39.50$28.69
Carpenter$48.54$28.84
Piledriver$47.71$30.98
SOFT FLOOR LAYER$45.25$26.48
MILLWRIGHT$42.00$28.85
CARPENTER (Including Acoustical work, Drywall Hanging & Piledriverman; Excluding Batt Insulation)$41.43$29.99
SOFT FLOOR LAYER$41.43$29.99
ELECTRICIAN$44.29$25.21
Electricians (Teledata System Installer/Technician)$31.17$20.08
ELEVATOR MECHANIC$62.52$38.43
OPERATOR: Power Equipment Group 1$50.53$27.89
Group 2$49.28$27.89
Group 3$45.73$27.89
Group 4$45.20$27.89
Group 5$43.13$27.89
Group 6$41.60$27.89
IRONWORKER$46.35$36.86
Laborer, General$37.70$19.97
Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical Systems)$36.65$19.97
DRYWALL FINISHER/TAPER$24.61$12.15
PAINTER$24.11$12.15
GLAZIER$42.72$11.93
PLUMBER/PIPEFITTER (Including HVAC work)$50.94$25.98
SPRINKLER FITTER$51.68$29.73
Sheet Metal Worker (Including HVAC duct work and Technicians)$42.00$31.56
TRUCK DRIVER 1 & 2 Axles$39.57$28.70
or more Axles$39.72$28.70
Asbestos Worker/Heat and Frost Insulator$25.36$8.37
Laborers: Concrete Worker$16.34$3.59
Landscape$8.73$4.90
ROOFER$18.01$3.28
Tile & Marble Finisher$13.89$8.25

Related Wage Determinations

View directory →