Skip to content
Davis-Bacon

WI20260011 (Rev 0)

Coverage: Wisconsin • Adams, Ashland, Barron +49.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
hanical systems. Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$45.88$38.15
hanical systems. Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$55.34$34.03
hanical systems. Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$49.17$23.83
floors, ceilings. Includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)$45.24$30.56
BOILERMAKER Boilermaker$46.52$34.63
Bricklayer & Tile Setter$40.09$28.10
BRICKLAYER Bricklayer, Tile Setter$48.60$29.31
Cement Mason/Concrete Finisher$46.01$29.31
BRICKLAYER Bricklayer & Tile Setter$48.60$29.31
BRICKLAYER Bricklayer, Cement Mason, Tile Setter$38.45$27.41
BRICKLAYER$44.71$28.90
CEMENT MASON/CONCRETE FINISHER$40.50$28.90
TILE SETTER$39.19$28.90
BRICKLAYER Bricklayer,Cement Mason,Tile Setter$39.36$28.83
Bricklayer & Tile Setter$39.36$28.83
Bricklayer & Tile Setter$40.34$29.49
Bricklayer$41.17$28.66
Tile Layer$38.39$29.79
BRICKLAYER Bricklayer, Cement Mason, Tile Layer$39.50$28.69
Bricklayer & Tile Setter$39.50$28.69
BRICKLAYER Bricklayer, Cement Mason, Tile Layer$40.14$29.67
BRICKLAYER Bricklayer, Cement Mason, Tile Layer$41.17$28.66
CARPENTER (Including Drywall Hanging, Acoustical work)$48.54$28.84
CARPENTER (Including Acoustical Work & Drywall Hanging)$41.43$29.99
PILEDRIVERMAN$41.43$29.99
CABINET INSTALLER (Including Acoustical Work & Drywall Hanging)$41.43$29.99
Carpenter (Including Drywall Hanging, Acoustical Work)$42.45$28.78
Piledriverman$44.45$28.78
Carpenters: (Including Drywall Hanging, Acoustical work)$40.79$27.90
MILLWRIGHT$42.00$28.85
MILLWRIGHT$41.90$29.51
ELECTRICIAN$44.29$25.21
Electricians (Teledata System Installer/Technician)$31.17$20.08
Electricians$42.00$23.93
Electricians$48.55$25.91
ELECTRICIAN$45.20$25.27
Sound & Communications Installer$37.13$21.58
Technician$37.13$21.58
ELECTRICIAN$41.76$23.65
ELECTRICIAN$43.65$25.95
OPERATOR: Power Equipment (1) Cranes, Tower Cranes with or w/o attachments over 100 tons; Cranes, tower Cranes with boom, leads and or jib length 176 ft or longer$50.53$27.89
Cranes, Tower Cranes with or w/o attachments 100 tons or less; Cranes, Tower Cranes with boom, leads, and or jib lengths 175 ft or less$49.28$27.89
Travelling Crane (bridge type)$45.73$27.89
Hydraulic Crane, 10 tons or less$45.20$27.89
Forklift$41.60$27.89
IRONWORKER$44.66$33.67
IRONWORKER$44.00$32.66
IRONWORKER$48.74$49.65
IRONWORKER$46.35$36.86
IRONWORKER$42.89$36.86
Laborer, General$37.70$19.97
Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical Systems)$36.65$19.97
Laborer, General Area 1$37.70$19.97
Area 2$37.05$19.97
Area 3$36.35$19.97
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems) Area 1, 2, and 3$36.65$19.97
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems)$36.65$19.97
Laborers, General$37.05$19.97
Laborer, General Adams County$37.05$19.97
Remaining Area$37.70$19.97
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous Materials from Non-mechanical Systems) Adams County$36.65$19.97
Remaining Area$36.65$19.97
Landscape Laborer$21.52$18.94
Laborer, General$36.04$23.47
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems)$37.04$23.47
Laborer, General$34.59$23.47
Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems)$35.59$23.47
CEMENT MASON/CONCRETE FINISHER$37.25$27.84
PLASTERER$39.75$25.10
CEMENT MASON/CONCRETE FINISHER$43.27$25.69
PLASTERER$39.89$28.04
CEMENT MASON/CONCRETE FINISHER$47.22$31.90
PLASTERER$40.84$25.66
PLUMBER/PIPEFITTER (Including HVAC work)$49.32$27.18
PLUMBER (Including HVAC work)$60.05$27.90
PLUMBER (Including HVAC work)$60.57$27.34
PLUMBER/PIPEFITTER (Including HVAC work)$57.35$29.37
or less$50.02$23.29
All other work$53.23$23.40
PLUMBER/PIPEFITTER (Including HVAC work)$50.94$25.98
PIPEFITTER (Including HVAC work)$58.92$31.34
PIPEFITTER (Including HVAC work)$60.13$30.16
SHEET METAL WORKER$40.43$29.99
SHEET METAL WORKER (HVAC Duct Installation Only)$31.97$20.67
Sheet Metal Worker (Including HVAC work)$45.07$31.04
Sheet Metal Worker (Including HVAC work)$46.47$31.33
Sheet Metal Worker (Including HVAC work)$58.03$29.98
SHEET METAL WORKER (Including HVAC work)$48.92$38.21
Sheet Metal Worker (Including HVAC work)$48.51$35.86
Sheet Metal Worker (Including HVAC work)$42.00$31.56
Sheet Metal Worker (Including HVAC work)$51.92$34.78
SHEET METAL WORKER (Including HVAC work)$45.63$29.02
Sheet Metal Worker (Including HVAC work)$42.90$32.47
TRUCK DRIVER 2 Axle Trucks$35.79$24.13
TRUCK DRIVER 2 Axle Trucks$39.57$28.57
or more Axles$39.72$28.57
Fence Installers$15.00$2.37
GLAZIER$20.21$1.86
Painters: Brush & Roller (Excluding Drywall Finishing)$14.64$2.55
Spray$13.72$2.25
Excavator$17.37$7.45
Front End Loader$23.36$4.61
ROOFER$15.52$3.21
TRUCK DRIVER (3-Axle)$15.28$4.78

Related Wage Determinations

View directory →