Davis-Bacon
WI20260001 (Rev 0)
Coverage: Wisconsin • Milwaukee, Ozaukee, Washington +1.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| material handler Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not | $45.88 | $38.15 |
| BOILERMAKER Boilermaker | $46.52 | $34.63 |
| TERRAZZO WORKER | $42.24 | $26.78 |
| TILE LAYER | $41.27 | $26.78 |
| BRICKLAYER | $45.72 | $27.42 |
| Marble Mason | $45.72 | $27.42 |
| Carpenter & Soft Floor Layer (Including Acoustical work and Drywall hanging; Excluding Batt Insulation) | $45.46 | $31.52 |
| MILLWRIGHT | $44.03 | $32.94 |
| PILEDRIVERMAN | $44.39 | $34.79 |
| ELECTRICIAN | $50.86 | $28.26 |
| Sound & Communications Installer | $37.13 | $21.58 |
| Technician | $37.13 | $21.58 |
| ELEVATOR MECHANIC | $61.96 | $38.43 |
| Power Equipment Operator Group 1 | $55.21 | $28.55 |
| Group 2 | $54.71 | $28.55 |
| Group 3 | $54.21 | $28.55 |
| Group 4 | $52.72 | $28.55 |
| Group 5 | $48.74 | $28.55 |
| Group 6 | $43.59 | $28.55 |
| IRONWORKER | $47.52 | $33.67 |
| LABORER (1) General Laborer (Including Plaster Tender) | $40.48 | $23.92 |
| Air & Electric Equipment, Mortar Mixer, Scaffold Builder, Erector, and Swing Stage | $40.62 | $23.92 |
| Jackhammer Operator, Gunnite Machine Man | $40.77 | $23.92 |
| Nozzleman | $41.13 | $23.92 |
| Caisson Work | $41.28 | $23.92 |
| Barco Tamper | $41.97 | $23.92 |
| Painters: (1) Brush, Roller | $42.44 | $24.87 |
| Spray & Sandblast | $43.19 | $24.87 |
| Drywall Taper/Finisher | $42.79 | $24.87 |
| GLAZIER | $49.79 | $25.15 |
| CEMENT MASON/CONCRETE FINISHER | $43.27 | $25.69 |
| PLASTERER | $39.89 | $28.04 |
| PLUMBER (Including HVAC work) | $60.05 | $27.90 |
| PIPEFITTER (Including HVAC work) | $58.92 | $31.34 |
| SPRINKLER FITTER | $52.40 | $34.31 |
| Sheet Metal Worker (Including HVAC duct work and Technicians) | $58.03 | $29.98 |
| TRUCK DRIVER 1 & 2 Axles | $39.57 | $28.70 |
| or more Axles | $39.72 | $28.70 |
| Asbestos Worker/Heat and Frost Insulator | $25.36 | $8.37 |
| Laborers: Concrete Worker | $16.34 | $3.59 |
| Landscape | $8.73 | $8.40 |
| ROOFER | $18.01 | $3.28 |
| Tile & Marble Finisher | $13.89 | $7.43 |
Related Wage Determinations
View directory →Davis-Bacon
WI20260037 (Rev 1)
Wisconsin • Eau Claire, La Crosse, Pierce +1
Davis-Bacon
WI20260033 (Rev 1)
Wisconsin • Brown, Kewaunee, Oconto
Davis-Bacon
WI20260025 (Rev 1)
Wisconsin • Chippewa
Davis-Bacon
WI20260036 (Rev 1)
Wisconsin • Douglas, Fond Du Lac, Marathon
Davis-Bacon
WI20260030 (Rev 1)
Wisconsin • Sheboygan
Davis-Bacon
WI20260032 (Rev 1)
Wisconsin • Winnebago