Davis-Bacon
WA20260132 (Rev 0)
Coverage: Washington • Thurston.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER, Excludes Form Work | $63.98 | $19.13 |
| ELECTRICIAN | $75.96 | $33.48 |
| TREE TRIMMER: Ground Person | $22.60 | $16.37 |
| TREE TRIMMER | $42.57 | $17.97 |
| OPERATOR: Backhoe/Excavator/Trackhoe 15 to 30 metric tons | $60.14 | $27.32 |
| Over 30 metric tons and up to 50 metric tons | $60.91 | $27.32 |
| Under 15 metric tons | $59.46 | $27.32 |
| OPERATOR: Bulldozer | $59.46 | $27.32 |
| OPERATOR: Loader Overhead under 6 yards; Plant feed | $60.14 | $27.32 |
| OPERATOR: Concrete Pump Mounted or trailer high pressure line pump, pump high pressure | $59.46 | $27.32 |
| Truck mount with boom attachment over 42M | $60.91 | $27.32 |
| Truck mount with boom attachment up to 42M | $60.14 | $27.32 |
| OPERATOR: Drill Drilling Machine | $61.81 | $27.32 |
| Horizontal/Directional Drill Locator | $59.46 | $27.32 |
| Horizontal/Directional Drill Operator | $60.14 | $27.32 |
| OPERATOR: Grader/Blade | $60.91 | $27.32 |
| OPERATOR: Oiler Drill Oilers: auger type; truck or crane mount; Truck Crane Oiler/Driver: under 100 tons | $60.14 | $27.32 |
| Truck Crane Oiler/Driver: 100 tons and over | $59.46 | $27.32 |
| OPERATOR: Scraper | $60.14 | $27.32 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: Mason Tender - Cement/Concrete | $50.38 | $16.96 |
| LABORER: Nozzle Person | $52.31 | $17.01 |
| LABORER: Common or General | $50.38 | $16.96 |
| LABORER: Pipelayer | $51.52 | $16.99 |
| TRAFFIC CONTROL: Flagger | $40.88 | $16.72 |
| PAINTER | $41.24 | $14.70 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| TRUCK DRIVER: Asphalt Mix | $55.43 | $27.52 |
| GRADE CHECKER | $48.64 | $18.82 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $39.00 | $14.40 |
| OPERATOR: Crane | $55.86 | $25.30 |
| FORM WORKER | $48.26 | $14.59 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $40.89 | $7.16 |
| LABORER: Concrete Saw Chain | $36.41 | $10.89 |
| LABORER: Hod Carrier | $38.58 | $10.89 |
| LABORER: Fence Erector | $29.70 | $0.00 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $51.50 | $0.00 |
| OPERATOR: Forklift | $49.89 | $0.00 |
| OPERATOR: Mechanic | $53.10 | $4.41 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $32.35 | $13.44 |
| OPERATOR: Roller | $44.66 | $13.93 |
| TRUCK DRIVER: Dump Truck | $27.32 | $12.50 |
| TRUCK DRIVER: Water Truck | $31.62 | $16.84 |
Related Wage Determinations
View directory →Davis-Bacon
WA20260001 (Rev 1)
Washington • Adams, Asotin, Benton +36
Davis-Bacon
WA20260117 (Rev 1)
Washington • Walla Walla
Davis-Bacon
WA20260061 (Rev 1)
Washington • Whitman
Davis-Bacon
WA20260054 (Rev 1)
Washington • Okanogan
Davis-Bacon
WA20260035 (Rev 1)
Washington • Okanogan
Davis-Bacon
WA20260033 (Rev 1)
Washington • Lincoln