Davis-Bacon
VT20260058 (Rev 0)
Coverage: Vermont • Windsor.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER, Includes Form Work | $20.46 | $3.65 |
| CEMENT MASON/CONCRETE FINISHER | $25.34 | $0.00 |
| ELECTRICIAN | $28.28 | $1.90 |
| HIGHWAY/PARKING LOT STRIPING: Painter | $20.80 | $4.62 |
| INSTALLER - SIGN | $18.50 | $5.52 |
| IRONWORKER, REINFORCING | $21.00 | $4.92 |
| IRONWORKER, STRUCTURAL | $28.97 | $8.72 |
| LABORER: Common or General, Including Asphalt Raking, Shoveling, Spreading and Concrete Work | $16.85 | $3.90 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $22.87 | $3.07 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $21.15 | $12.05 |
| OPERATOR: Broom/Sweeper | $19.94 | $6.29 |
| OPERATOR: Bulldozer | $20.71 | $0.92 |
| OPERATOR: Crane | $22.48 | $3.00 |
| OPERATOR: Drill | $20.23 | $4.50 |
| OPERATOR: Grader/Blade | $20.91 | $5.79 |
| OPERATOR: Loader | $22.29 | $4.48 |
| OPERATOR: Mechanic | $20.45 | $4.54 |
| OPERATOR: Milling Machine | $28.76 | $16.77 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $23.09 | $8.53 |
| OPERATOR: Pounder | $20.70 | $3.78 |
| OPERATOR: Roller | $22.55 | $9.48 |
| OPERATOR: Screed | $20.78 | $10.07 |
| TRAFFIC CONTROL: Flagger | $11.15 | $4.40 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $17.42 | $7.11 |
| TRUCK DRIVER, Includes all axles including Dump Trucks | $18.60 | $3.58 |
| TRUCK DRIVER: Distributor Truck | $22.32 | $0.00 |