Skip to content
Davis-Bacon

VA20260139 (Rev 1)

Coverage: Virginia • Henrico, Richmond*.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BRICKLAYER$22.44$10.23
POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS)$39.99$18.05
POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND)$40.99$18.05
TRUCK DRIVER: DUMP TRUCK$16.30$0.00
ROOFER$13.15$0.00
PLUMBER$16.71$0.76
PAINTER (BRUSH AND ROLLER)$13.02$0.00
OPERATOR: LOADER$15.21$2.77
OPERATOR: BULLDOZER$14.91$2.27
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$15.26$0.80
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$18.58$1.98
LABORER: PIPELAYER$14.70$1.71
LABORER: MASON TENDER - CEMENT/CONCRETE$12.84$0.00
LABORER: MASON TENDER - BRICK$13.56$0.00
LABORER: COMMON OR GENERAL$10.43$0.00
IRONWORKER, STRUCTURAL$21.55$1.39
IRONWORKER, ORNAMENTAL$15.59$0.00
ELECTRICIAN$16.18$0.00
DRYWALL HANGER AND METAL STUD INSTALLER$15.32$0.00
CEMENT MASON/CONCRETE FINISHER$15.05$0.00
CARPENTER$17.99$0.00

Related Wage Determinations

View directory →