Davis-Bacon
VA20260139 (Rev 1)
Coverage: Virginia • Henrico, Richmond*.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BRICKLAYER | $22.44 | $10.23 |
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 |
| TRUCK DRIVER: DUMP TRUCK | $16.30 | $0.00 |
| ROOFER | $13.15 | $0.00 |
| PLUMBER | $16.71 | $0.76 |
| PAINTER (BRUSH AND ROLLER) | $13.02 | $0.00 |
| OPERATOR: LOADER | $15.21 | $2.77 |
| OPERATOR: BULLDOZER | $14.91 | $2.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $15.26 | $0.80 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.58 | $1.98 |
| LABORER: PIPELAYER | $14.70 | $1.71 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.84 | $0.00 |
| LABORER: MASON TENDER - BRICK | $13.56 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.43 | $0.00 |
| IRONWORKER, STRUCTURAL | $21.55 | $1.39 |
| IRONWORKER, ORNAMENTAL | $15.59 | $0.00 |
| ELECTRICIAN | $16.18 | $0.00 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $15.32 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.05 | $0.00 |
| CARPENTER | $17.99 | $0.00 |