Davis-Bacon
VA20260127 (Rev 1)
Coverage: Virginia • Isle of Wight.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 |
| TRUCK DRIVER: MULTI AXLE | $18.77 | $4.63 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $16.98 | $0.00 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $18.26 | $4.88 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $12.89 | $0.00 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $19.43 | $0.00 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $19.09 | $1.81 |
| OPERATOR: SCREED | $22.13 | $4.89 |
| OPERATOR: ROLLER | $21.32 | $0.00 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.12 | $3.81 |
| OPERATOR: MILLING MACHINE | $23.12 | $3.60 |
| OPERATOR: MECHANIC | $21.43 | $0.00 |
| OPERATOR: LOADER | $17.86 | $0.00 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 |
| OPERATOR: GRADALL | $19.26 | $0.00 |
| OPERATOR: DRILL | $24.66 | $0.00 |
| OPERATOR: CRANE | $24.42 | $4.69 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.74 | $0.00 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 |
| LABORER: PIPELAYER | $17.76 | $0.00 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.81 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $18.62 | $2.62 |
| IRONWORKER, STRUCTURAL | $27.38 | $0.00 |
| IRONWORKER, REINFORCING | $24.03 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.03 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $20.21 | $0.00 |