Skip to content
Davis-Bacon

VA20260126 (Rev 1)

Coverage: Virginia • Henrico, Richmond*.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION$36.85$14.13
TRUCK DRIVER: MULTI AXLE$17.94$0.00
TRUCK DRIVER: HEAVY OVER 7 CY$16.98$0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE$18.25$0.00
TRUCK DRIVER: 1/SINGLE AXLE TRUCK$16.48$3.64
TRUCK DRIVER : HEAVY 7CY & UNDER$15.53$0.00
TRAFFIC CONTROL: FLAGGER$12.89$0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY$18.22$2.69
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR$19.09$1.81
OPERATOR: SCREED$22.13$4.89
OPERATOR: ROLLER (FINISHING)$19.05$1.29
OPERATOR: ROLLER$21.69$0.00
OPERATOR: PILEDRIVER$21.83$4.08
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$20.44$3.83
OPERATOR: MILLING MACHINE$23.12$3.60
OPERATOR: MECHANIC$21.43$0.00
OPERATOR: LOADER$17.17$0.00
OPERATOR: HYDROSEEDER$16.64$0.00
OPERATOR: GRADER/BLADE$23.21$0.00
OPERATOR: GRADALL$19.26$0.00
OPERATOR: DRILL$24.66$0.00
OPERATOR: CRANE$24.42$4.69
OPERATOR: BROOM/SWEEPER$17.40$2.01
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$19.16$4.45
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$17.61$2.53
LABORER: POWER TOOL OPERATOR$15.69$0.00
LABORER: PIPELAYER$17.76$0.00
LABORER: GRADE CHECKER$14.88$0.00
LABORER: COMMON OR GENERAL$15.74$2.05
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$19.21$2.82
IRONWORKER, STRUCTURAL$27.38$0.00
IRONWORKER, REINFORCING$20.80$0.00
CEMENT MASON/CONCRETE FINISHER$16.03$0.00
CARPENTER, INCLUDES FORM WORK$19.22$0.00

Related Wage Determinations

View directory →