Davis-Bacon
VA20260103 (Rev 1)
Coverage: Virginia • Alexandria*, Arlington.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 |
| LABORER: COMMON OR GENERAL | $23.06 | $8.74 |
| CEMENT MASON/CONCRETE FINISHER | $20.70 | $8.03 |
| TRUCK DRIVER: MULTI AXLE | $20.34 | $2.89 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $18.05 | $0.00 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $19.35 | $0.00 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $13.64 | $0.00 |
| PAVEMENT MARKING TRUCK DRIVER | $18.78 | $0.00 |
| PAVEMENT MARKING OPERATOR | $22.15 | $0.00 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $20.64 | $0.00 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $20.58 | $2.31 |
| OPERATOR: SCREED | $22.13 | $4.89 |
| OPERATOR: ROLLER (FINISHING) | $18.73 | $3.23 |
| OPERATOR: ROLLER | $18.92 | $0.00 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.33 | $2.81 |
| OPERATOR: PAVEMENT PLANER GROUNDSMEN | $19.75 | $0.00 |
| OPERATOR: PAVEMENT PLANER | $21.14 | $0.00 |
| OPERATOR: MILLING MACHINE | $23.19 | $2.94 |
| OPERATOR: MECHANIC | $22.84 | $0.00 |
| OPERATOR: LOADER | $18.92 | $0.00 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 |
| OPERATOR: GRADALL | $19.26 | $0.00 |
| OPERATOR: DRILL | $24.89 | $0.00 |
| OPERATOR: CRANE | $29.46 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.00 | $3.49 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.93 | $0.00 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 |
| LABORER: PIPELAYER | $20.48 | $0.00 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.06 | $1.75 |
| IRONWORKER, STRUCTURAL | $34.18 | $0.00 |
| IRONWORKER, REINFORCING | $34.18 | $0.00 |
| FENCE ERECTOR | $15.28 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $20.97 | $0.00 |