Davis-Bacon
VA20260011 (Rev 1)
Coverage: Virginia • Albemarle.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| EMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 |
| BOILERMAKER | $38.97 | $27.39 |
| OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $51.39 | $38.44 |
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 |
| IRONWORKER, ORNAMENTAL AND STRUCTURAL | $37.86 | $25.86 |
| PAINTER: SPRAY ONLY | $29.16 | $11.86 |
| TRUCK DRIVER: DUMP TRUCK | $16.58 | $1.73 |
| TILE SETTER | $27.80 | $10.25 |
| TILE FINISHER | $23.40 | $0.00 |
| ROOFER | $16.17 | $3.73 |
| PLUMBER | $21.32 | $2.31 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $23.32 | $6.04 |
| PAINTER (BRUSH AND ROLLER) | $20.01 | $0.00 |
| OPERATOR: ROLLER | $16.25 | $4.88 |
| OPERATOR: LOADER | $21.28 | $3.17 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 |
| OPERATOR: BULLDOZER | $16.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.24 | $0.87 |
| LABORER: PIPELAYER | $12.00 | $1.17 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.32 | $0.00 |
| LABORER: MASON TENDER - BRICK | $13.41 | $3.15 |
| LABORER: COMMON OR GENERAL | $10.00 | $1.15 |
| IRONWORKER, REINFORCING | $25.36 | $6.68 |
| ELECTRICIAN | $24.01 | $8.28 |
| CARPENTER | $14.81 | $2.19 |
| BRICKLAYER | $23.54 | $6.73 |