Davis-Bacon
UT20260019 (Rev 0)
Coverage: Utah • Iron.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| OPERATOR: Power Equipment (3)Backhoe/Excavator | $30.78 | $16.09 |
| OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher | $35.68 | $17.57 |
| Oiler | $22.03 | $11.88 |
| LABORER Chain Saw and Power Drill | $20.85 | $8.65 |
| Common or General, Nail gun, Pipelayer, Pot Tender | $20.59 | $8.65 |
| Formworker | $20.85 | $8.65 |
| Powderman | $21.65 | $8.65 |
| Sandblaster | $20.85 | $8.65 |
| TRUCK DRIVER Group 1: Articulated End Dump, Low Boy, Rollagon or Similar type Equipment, Truck Mechanic | $46.65 | $15.75 |
| p 2: A-Frame, Challenger(For transportation purposes), Forklift, Fuel Truck, Gin Pole, Rubber-Tired Tractor, Tandem Float (4 & 5 Axle), Track Truck/All-Track Dumper Equipment, Vacuum Truck, Winch Truck | $46.02 | $15.75 |
| CARPENTER, Includes Form Work (Excludes Natural Gas Pipeline Construction Form Work) | $14.75 | $3.03 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 |
| LABORER: Mason Tender - Cement/Concrete | $9.00 | $0.36 |
| LABORER: Common or General (Excluding Natural Gas Pipeline Construction) | $9.00 | $0.00 |
| LABORER: Pipelayer (Excluding Natural Gas Pipeline Construction) | $9.00 | $0.00 |
| OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction | $13.61 | $0.00 |
| OPERATOR: Loader (Front End) | $11.38 | $0.00 |
| OPERATOR: Roller (Dirt and Grade Compaction) | $10.89 | $0.00 |
| OPERATOR: Trackhoe (Excluding Natural Gas Pipeline Construction) | $13.63 | $0.00 |
| TRUCK DRIVER (Excluding Natural Gas Pipeline Construction) | $12.00 | $0.00 |