Coverage: Utah • Summit.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
LINE CONSTRUCTION Lineman$58.83$8.35
OPERATOR: Power Equipment (1)Mechanic-Excluding Natural Gas Pipeline Construction$41.71$18.62
A)Blade/Grader$40.32$18.62
Backhoe/Excavator, Front End Loader(Over 5 cu.yds.)$39.01$18.62
Asphalt Paver, Bulldozer, Front End Loader(2 to 5 cu. yds.), Grade Setter, Oil Distributor, Scraper$37.79$18.62
Asphalt Roller, Bobcat/Skid loader, Front End Loader(Under 2 cu. yds.), Oiler$36.55$18.62
Screed$36.55$18.62
Roller(Dirt and Grade Compaction)$34.25$18.62
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Mechanic$35.68$17.57
Oiler$22.03$11.88
IRONWORKER$32.68$27.55
LABORER Common or General, Pipelayer$20.59$8.65
LABORER (1)Flagger$20.59$8.65
Mason Tender (Cement/Concrete), Hand Held Saw, Jackhammer, Power Saw$20.85$8.65
Hand Held Drill$21.65$8.65
LABORER (1)Common or General)$20.59$8.65
TRUCK DRIVER ZONE 1: Group 1$41.39$15.10
Group 2$40.75$15.10
Group 3$40.37$15.10
ZONE 2: Group 1$46.65$15.75
Group 2$46.02$15.75
Group 3$41.90$15.75
CARPENTER, Includes Form Work$14.63$0.97
CEMENT MASON/CONCRETE FINISHER$17.08$3.14
ELECTRICIAN$23.74$7.64
LABORER: Landscape$7.25$0.00
LABORER: Pipelayer (Excluding Natural Gas Pipeline Construction)$14.00$0.00
OPERATOR: Crane$28.97$9.40
OPERATOR: Trackhoe (Excluding Natural Gas Pipeline and Water/Sewer Line Construction)$19.98$0.00
TRUCK DRIVER (Excluding Natural Gas Pipeline Construction)$14.40$3.99
WATER & SEWER LINES: Laborer, Common or General$12.81$0.00
WATER & SEWER LINES: Operator-Backhoe/Excavator/Tra ckhoe$15.57$0.00