Davis-Bacon
TX20260236 (Rev 0)
Coverage: Texas • Cameron.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $33.17 | $24.92 |
| POWER EQUIPMENT OPERATOR (1) Tower Crane | $32.85 | $13.10 |
| Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above | $28.75 | $10.60 |
| Hydraulic cranes 59 Tons and under | $32.35 | $13.10 |
| IRONWORKER, ORNAMENTAL | $28.26 | $8.13 |
| PIPEFITTER (HVAC Pipe Installation Only) | $42.09 | $12.96 |
| BRICKLAYER | $16.17 | $0.00 |
| CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation | $16.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.46 | $0.00 |
| DRYWALL FINISHER/TAPER | $10.75 | $2.68 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $19.42 | $0.37 |
| ELECTRICIAN (Low Voltage Wiring Only) | $13.50 | $0.68 |
| ELECTRICIAN, Excludes Low Voltage Wiring | $14.00 | $0.54 |
| INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation) | $14.04 | $4.79 |
| IRONWORKER, REINFORCING | $12.01 | $0.00 |
| IRONWORKER, STRUCTURAL | $15.04 | $4.34 |
| LABORER: Common or General | $8.87 | $0.00 |
| LABORER: Mason Tender - Brick | $10.00 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $10.89 | $0.96 |
| LABORER: Pipelayer | $11.00 | $3.47 |
| LABORER: Roof Tearoff | $10.06 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $13.15 | $0.00 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $13.93 | $0.00 |
| OPERATOR: Bulldozer | $18.29 | $1.31 |
| OPERATOR: Drill | $16.22 | $0.34 |
| OPERATOR: Forklift | $14.83 | $0.00 |
| OPERATOR: Grader/Blade | $13.07 | $0.00 |
| OPERATOR: Loader | $12.87 | $0.70 |
| OPERATOR: Mechanic | $17.00 | $0.00 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $16.03 | $0.00 |
| OPERATOR: Roller | $12.70 | $0.00 |
| PAINTER (Brush, Roller and Spray), Excludes Drywall Finishing/Taping | $11.27 | $0.00 |
| PIPEFITTER, Excludes HVAC Pipe Installation | $14.67 | $2.50 |
| PLUMBER, Excludes HVAC Pipe Installation | $13.59 | $0.00 |
| ROOFER | $11.42 | $0.00 |
| SHEET METAL WORKER (HVAC Duct Installation Only) | $18.40 | $2.12 |
| SHEET METAL WORKER, Excludes HVAC Duct Installation | $21.13 | $6.53 |
| TILE FINISHER | $11.22 | $0.00 |
| TILE SETTER | $12.15 | $0.00 |
| TRUCK DRIVER: Dump Truck | $12.39 | $1.18 |
| TRUCK DRIVER: Flatbed Truck | $19.65 | $8.57 |
| TRUCK DRIVER: Semi-Trailer Truck | $12.50 | $0.00 |
| TRUCK DRIVER: Water Truck | $12.00 | $4.11 |