Davis-Bacon
TN20260200 (Rev 0)
Coverage: Tennessee • Fayette, Shelby.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 |
| CARPENTER | $30.20 | $14.74 |
| ELECTRICIAN (Excludes Low Voltage Wiring) | $34.90 | $15.90 |
| IRONWORKER, ORNAMENTAL | $33.73 | $17.73 |
| IRONWORKER, REINFORCING | $33.73 | $17.73 |
| IRONWORKER, STRUCTURAL | $33.73 | $17.73 |
| SHEET METAL WORKER (HVAC Duct Installation Only) | $34.95 | $16.66 |
| SHEET METAL WORKER (HVAC Unit Installation Only) | $34.95 | $16.66 |
| SHEET METAL WORKER (Excludes HVAC Duct Installation) | $34.95 | $16.66 |
| BRICKLAYER | $20.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.25 | $0.00 |
| ELECTRICIAN (Low Voltage Wiring) | $25.31 | $9.18 |
| GLAZIER | $16.99 | $3.70 |
| LABORER DEMOLITION | $16.74 | $0.00 |
| LABORER GRADE CHECKER | $13.01 | $0.00 |
| LABORER: Common or General | $13.97 | $1.30 |
| LABORER: Mason Tender - Brick | $13.54 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $15.33 | $0.00 |
| LABORER: Pipelayer | $14.99 | $2.41 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $23.06 | $0.00 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $16.84 | $0.00 |
| OPERATOR: Bulldozer | $28.19 | $9.65 |
| OPERATOR: Crane | $25.70 | $7.75 |
| OPERATOR: Drill | $26.50 | $4.09 |
| OPERATOR: Forklift | $15.00 | $0.00 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $14.70 | $0.00 |
| OPERATOR: Roller | $14.35 | $0.00 |
| PAINTER (Brush and Roller) | $17.00 | $0.00 |
| PIPEFITTER | $29.54 | $12.41 |
| PLUMBER | $26.86 | $10.40 |
| ROOFER | $16.29 | $0.00 |
| TILE FINISHER | $14.00 | $0.00 |
| TILE SETTER | $19.65 | $0.00 |
| TRUCK DRIVER: Dump Truck | $15.28 | $0.00 |