Davis-Bacon
PR20260008 (Rev 0)
Coverage: Puerto Rico • Canovanas.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN Lineperson | $45.80 | $8.05 |
| CARPENTER | $8.75 | $0.61 |
| CEMENT MASON/CONCRETE FINISHER | $8.60 | $0.47 |
| ELECTRICIAN | $8.80 | $1.22 |
| HIGHWAY/PARKING LOT STRIPING: Laborer | $8.25 | $0.56 |
| IRONWORKER, STRUCTURAL | $8.25 | $0.57 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $9.40 | $0.61 |
| LABORER: Common or General | $7.78 | $0.43 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $10.49 | $0.76 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $9.65 | $0.73 |
| OPERATOR: Bulldozer | $10.88 | $0.91 |
| OPERATOR: Crane | $12.11 | $0.91 |
| OPERATOR: Equipment Greaser ( Grease Truck) | $9.54 | $1.15 |
| OPERATOR: Grader/Blade | $12.53 | $1.25 |
| OPERATOR: Mechanic | $10.19 | $0.94 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $10.88 | $3.15 |
| OPERATOR: Roller | $9.67 | $3.14 |
| TRAFFIC CONTROL: Flagger | $8.28 | $0.53 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $9.81 | $0.95 |
| TRUCK DRIVER: Dump Truck | $9.40 | $0.85 |
| TRUCK DRIVER: Pickup Truck | $9.21 | $0.48 |
Related Wage Determinations
View directory →Davis-Bacon
PR20260025 (Rev 0)
Puerto Rico • Juana Diaz, Ponce, Villalba
Davis-Bacon
PR20260012 (Rev 0)
Puerto Rico • Morovis
Davis-Bacon
PR20260015 (Rev 0)
Puerto Rico • Sabana Grande
Davis-Bacon
PR20260023 (Rev 0)
Puerto Rico • Guanica, Guayanilla, Penuelas +1
Davis-Bacon
PR20260024 (Rev 0)
Puerto Rico • Hormigueros, Mayaguez
Davis-Bacon
PR20260014 (Rev 0)
Puerto Rico • Naranjito