OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation) (Asbestos Abatement, Removal from Mechanical Systems Only)$40.00$29.81
BOILERMAKER$55.00$35.48
BRICKLAYER (Including Pointing, Caulking, and Cleaning)$33.99$16.87
PILEDRIVERMAN$43.13$23.42
CARPENTER (Scaffold Building Only)$34.76$20.64
MILLWRIGHT$43.00$23.44
CARPENTER (Drywall Hanging and Metal Stud Installation Only)$34.76$20.64
ELECTRICIAN (Includes HVAC/Temperature Controls Installation, and Low Voltage Wiring; Excludes Installation of Sound and Communication Systems and Alarm Installation)$40.00$27.42
ELECTRICIAN (Alarm Installation Only)$40.31$23.93
ELECTRICIAN (Installation of Communication and Sound System)$34.77$20.19
ELEVATOR MECHANIC$58.70$38.43
POWER EQUIPMENT OPERATOR Mechanic$36.87$21.32
Pump$32.25$21.32
POWER EQUIPMENT OPERATOR Crane$47.14$31.58
Hoist (Single Drum), Forklift (under 20 ft., excludes masonry work)$41.88$30.03
Hoist (With Two Towers), Forklift (20 ft and over, excludes masonry work)$44.61$30.83
Oiler$39.42$29.30
IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL$37.26$32.63
LABORER (Asbestos Abatement (Removal from Floors, Walls, and Ceilings))$27.97$20.39
Forklift (Masonry Work Only)$28.52$19.48
Jack Hammer; Mason Tender- Brick$27.02$19.48
PAINTER (Brush, Roller, and Spray)$26.98$15.65
PLUMBER$41.36$29.45
PIPEFITTER (Includes HVAC Pipe and HVAC Unit Installation)$41.36$29.45
SPRINKLER FITTER (Fire Sprinklers)$49.75$30.26
SHEET METAL WORKER (Includes HVAC Duct Installation)$43.09$42.52
OPERATOR: Bulldozer$37.85$22.72
CARPENTER (Acoustical Ceiling Installation Only)$37.73$4.59
CARPENTER (Form Work Only)$23.39$10.25
CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging and Metal Stud Installation, Form Work, and Scaffold Building$21.71$6.62
CEMENT MASON/CONCRETE FINISHER$26.33$10.14
FLOOR LAYER: Carpet Only$18.78$5.02
FLOOR LAYER: Hardwood Floors Only$26.91$11.88
FLOOR LAYER: Vinyl Flooring Only$19.71$5.94
GLAZIER$20.00$1.54
LABORER: Common or General$18.09$8.34
LABORER: Landscape$15.01$0.00
LABORER: Mason Tender - Cement/Concrete$26.17$4.88
OPERATOR: Backhoe/Excavator/Trackhoe$23.73$7.50
OPERATOR: Bobcat/Skid Steer/Skid Loader$24.14$13.55
OPERATOR: Drill$25.58$17.07
OPERATOR: Gradall$32.70$18.43
OPERATOR: Grader/Blade$32.51$17.98
OPERATOR: Loader$27.05$14.52
OPERATOR: Paver (Asphalt, Aggregate, and Concrete)$30.39$15.05
OPERATOR: Roller$30.39$13.72
ROOFER, Excludes Waterproofing$21.32$10.39
ROOFER: Waterproofing Only$28.60$18.02
TILE FINISHER$20.65$8.24
TILE SETTER$24.31$11.62
TRUCK DRIVER: Dump Truck$19.77$5.02