Skip to content
Davis-Bacon

PA20260089 (Rev 4)

Coverage: Pennsylvania • Fayette.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE))$46.50$29.43
BOILERMAKER$48.28$33.17
TILE SETTER$35.64$21.63
TILE FINISHER$28.76$17.16
TO THE BASE WAGE FOR BRICK REFRACTORY WORK$36.55$24.46
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD, CARPET AND VINYL; FORM WORK, AND SCAFFOLD BUILDING)$38.92$20.06
PILEDRIVERMAN$43.13$23.42
MILLWRIGHT$43.00$23.44
ELECTRICIAN (INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION)$49.11$36.79
POWER EQUIPMENT OPERATOR: OILER$32.83$24.05
POWER EQUIPMENT OPERATOR: LOADER$41.69$24.05
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED)$35.62$24.05
POWER EQUIPMENT OPERATOR: LOADER$29.58$20.15
IRONWORKER (METAL ROOF INSTALLATION, ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION)$38.89$34.54
LABORER (MASON TENDER - CEMENT/CONCRETE)$30.24$12.05
LABORER (MASON TENDER- BRICK)$22.17$13.65
LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILINGS))$27.97$20.39
PAINTER: DRYWALL FINISHING/TAPING$32.39$23.26
PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES)$30.56$23.72
PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY)$36.01$23.72
PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY)$36.01$23.72
GLAZIER$35.65$29.73
CEMENT MASON/CONCRETE FINISHER$31.77$21.89
PLASTERER$30.69$18.99
PIPEFITTER (INDUSTRIAL)$47.75$26.55
PLUMBER (INCLUDES HVAC PIPE INSTALLATION)$40.02$26.55
PIPEFITTER (EXCLUDES WORK ON INDUSTRIAL SITES)$46.10$27.97
ROOFER (INCLUDES WATERPROOFING, EXCLUDES METAL ROOF INSTALLATION)$41.21$21.46
SPRINKLER FITTER (FIRE SPRINKLERS)$49.75$30.26
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION)$39.50$30.79
TRUCK DRIVER: DUMP TRUCK$23.36$7.60
LABORER: LUTEMAN$21.13$8.23
LABORER: LANDSCAPE$18.10$0.00
LABORER: COMMON OR GENERAL$20.92$9.27
LABORER: ASPHALT RAKER$20.92$9.09

Related Wage Determinations

View directory →