Davis-Bacon
OH20260054 (Rev 1)
Coverage: Ohio • Sandusky.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| TILE FINISHER | $30.78 | $23.04 |
| TILE SETTER | $36.53 | $24.03 |
| BRICKLAYER | $36.53 | $24.03 |
| BRICK POINTER/CAULKER/CLEANER | $36.53 | $24.03 |
| CEMENT MASON/CONCRETE FINISHER | $34.53 | $23.04 |
| SOFT FLOOR LAYER | $37.52 | $23.50 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS/HVAC TEMPERATURE CONTROLS) | $48.40 | $25.24 |
| PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 |
| FOR LESS THAN 5 YEARS' SERVICE | $57.33 | $38.44 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $42.98 | $16.41 |
| POWER EQUIPMENT OPERATOR: CRANE | $44.14 | $16.41 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $36.00 | $23.57 |
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE | $32.35 | $16.42 |
| PAINTER, DRYWALL TAPER (DRYWALL FINISHING/TAPING ONLY) | $33.43 | $18.15 |
| PLASTERER | $31.68 | $15.46 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 |
| ROOFER | $40.15 | $21.28 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT AND UNIT INSTALLATION) | $38.36 | $29.59 |
| TRUCK DRIVER: DUMP (ALL TYPES) | $18.88 | $4.14 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $28.89 | $10.53 |
| PLUMBER | $32.69 | $18.70 |
| PAINTER (BRUSH AND ROLLER) | $20.91 | $10.49 |
| OPERATOR: ROLLER | $22.16 | $8.07 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.85 | $10.42 |
| OPERATOR: LOADER | $19.87 | $5.91 |
| OPERATOR: BULLDOZER | $24.19 | $8.24 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.56 | $7.13 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $30.20 | $12.96 |
| LABORER: PIPELAYER | $18.37 | $4.79 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $20.91 | $8.20 |
| CARPENTER (EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION, AND SOFT FLOOR LAYING) | $25.17 | $14.56 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.16 | $26.11 |
| CARPENTER: PILEDRIVERMAN | $30.06 | $17.61 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $25.49 | $15.67 |
| IRONWORKER: REINFORCING | $33.44 | $23.55 |
| LABORER: MASON TENDER - BRICK | $27.81 | $11.24 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $39.31 | $24.23 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.53 | $26.35 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $30.03 | $25.53 |