Davis-Bacon
OH20260023 (Rev 0)
Coverage: Ohio • Belmont.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR (Bulldozer) | $37.02 | $15.20 |
| POWER EQUIPMENT OPERATOR Crane | $36.92 | $24.01 |
| LABORER (Mason Tender-Brick) | $25.90 | $18.40 |
| PAINTER (Brush and Roller) | $33.95 | $20.20 |
| CEMENT MASON/CONCRETE FINISHER | $33.48 | $24.81 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $20.54 | $7.17 |
| ELECTRICIAN | $18.98 | $10.14 |
| BRICKLAYER | $28.40 | $11.78 |
| CARPENTER | $20.19 | $6.51 |
| LABORER: Common or General | $21.50 | $5.23 |
| OPERATOR: Backhoe/Excavator | $29.49 | $11.16 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $29.49 | $11.16 |
| PLUMBER | $20.00 | $5.52 |
| ROOFER | $16.85 | $3.83 |