Davis-Bacon
NM20260025 (Rev 0)
Coverage: New Mexico • Otero.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Carpenter Metal Stud Installation Only | $24.08 | $10.79 |
| Power Equipment Operator (2) Roller(Dirt and Grade Compaction) | $26.75 | $4.65 |
| Bobcat/Skid Loader | $27.70 | $4.65 |
| Crane | $31.43 | $4.65 |
| IRONWORKER, ORNAMENTAL | $28.05 | $18.11 |
| IRONWORKER, STRUCTURAL (Metal Building Erection Only) | $28.05 | $18.11 |
| PIPEFITTER (Including HVAC Pipe Installation) | $43.07 | $16.60 |
| PLUMBER (Excluding HVAC Pipe Installation) | $43.07 | $16.60 |
| Sheet Metal Worker (HVAC Duct and System Installation Only) | $37.50 | $18.51 |
| BOILERMAKER | $21.77 | $3.98 |
| BRICKLAYER | $20.36 | $5.74 |
| CARPENTER (Acoustical Ceiling Installation Only) | $20.79 | $0.00 |
| CARPENTER (Drywall Finishing/Taping Only) | $20.18 | $4.54 |
| CARPENTER (Drywall Hanging Only) | $21.39 | $2.85 |
| CARPENTER (Form Work Only) | $20.46 | $5.61 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Batt Insulation, Drywall Finishing/Taping, Drywall Hanging, Form Work, and Metal Stud Installation | $20.86 | $6.25 |
| CEMENT MASON/CONCRETE FINISHER | $17.72 | $5.43 |
| ELECTRICIAN (Low Voltage Wiring for Alarms) | $28.25 | $6.62 |
| FLOOR LAYER: Carpet | $22.31 | $0.30 |
| GLAZIER | $20.15 | $3.95 |
| INSULATOR - BATT | $24.44 | $8.43 |
| IRONWORKER, REINFORCING | $19.75 | $8.45 |
| IRONWORKER, STRUCTURAL, Excludes Metal Building Erection | $22.00 | $9.03 |
| LABORER: Common or General | $13.61 | $3.89 |
| LABORER: Landscape & Irrigation | $10.60 | $0.24 |
| LABORER: Mason Tender - Brick | $13.77 | $4.35 |
| LABORER: Mason Tender - Cement/Concrete | $11.51 | $0.85 |
| LABORER: Pipelayer | $13.78 | $2.20 |
| OPERATOR: Backhoe | $20.95 | $4.73 |
| OPERATOR: Forklift | $21.13 | $4.83 |
| OPERATOR: Grader/Blade | $21.40 | $4.95 |
| OPERATOR: Loader (Front End) | $21.55 | $4.97 |
| PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping | $16.10 | $1.79 |
| PLASTERER | $12.00 | $0.00 |
| ROOFER | $13.24 | $0.50 |
| SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation | $22.01 | $9.65 |
| TILE FINISHER | $14.02 | $0.00 |
| TILE SETTER | $19.00 | $0.00 |
| TRUCK DRIVER: Dump Truck | $15.25 | $3.89 |
| TRUCK DRIVER: Pickup Truck | $15.91 | $3.13 |
| TRUCK DRIVER: Water Truck | $16.26 | $4.93 |
Related Wage Determinations
View directory →Davis-Bacon
NM20260015 (Rev 1)
New Mexico • Colfax
Davis-Bacon
NM20260028 (Rev 1)
New Mexico • San Miguel
Davis-Bacon
NM20260026 (Rev 1)
New Mexico • Rio Arriba
Davis-Bacon
NM20260030 (Rev 1)
New Mexico • Union
Davis-Bacon
NM20260031 (Rev 1)
New Mexico • Cibola, Guadalupe, Harding +3
Davis-Bacon
NM20260021 (Rev 0)
New Mexico • Lincoln