Davis-Bacon
NE20260058 (Rev 0)
Coverage: Nebraska • Lancaster.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (Including Acoustical Ceiing Installation) | $33.42 | $18.66 |
| ELECTRICIAN Zone 1 | $35.00 | $18.88 |
| Zone 2 | $35.30 | $18.91 |
| Zone 3 | $35.60 | $18.94 |
| Zone 4 | $36.00 | $18.99 |
| ELEVATOR MECHANIC | $55.88 | $38.43 |
| OPERATOR: Crane | $36.44 | $18.69 |
| OPERATOR: Forklift | $31.06 | $18.69 |
| IRONWORKER, STRUCTURAL | $39.00 | $22.30 |
| LABORER (Mason Tender, Brick & Hod) | $24.00 | $13.48 |
| PIPEFITTER (Including HVAC Pipe Installation) | $46.25 | $21.10 |
| SHEET METAL WORKER (Excludes Installation of HVAC Duct) | $39.65 | $19.87 |
| BRICKLAYER | $24.44 | $0.00 |
| CARPENTER | $18.50 | $1.80 |
| CEMENT MASON/CONCRETE FINISHER | $15.73 | $2.06 |
| ELECTRICIAN (Alarm Installation) | $19.68 | $4.12 |
| ELECTRICIAN (Low Voltage Wiring) | $20.15 | $4.84 |
| FORM WORKER | $14.97 | $2.06 |
| LABORER: Common or General | $12.03 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $20.68 | $4.93 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $21.72 | $2.10 |
| OPERATOR: Loader | $19.27 | $4.00 |
| PAINTER: Brush, Roller and Spray | $14.26 | $0.00 |
| PLUMBER, Excludes HVAC Pipe Installation | $22.89 | $6.04 |
| ROOFER | $13.57 | $0.77 |
| SHEET METAL WORKER (HVAC Duct Installation Only) | $21.89 | $6.30 |
| TRUCK DRIVER, Includes Dump and Tandem Truck | $14.09 | $2.49 |