Skip to content
Davis-Bacon

NC20260059 (Rev 0)

Coverage: North Carolina • Stanly.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
PIPEFITTER (Excluding HVAC System Installation)$31.66$12.69
BRICKLAYER$19.09$8.73
CARPENTER (Drywall Hanging Only)$18.13$1.31
CARPENTER, Excludes Drywall Hanging, and Form Work$15.93$2.99
CEMENT MASON/CONCRETE FINISHER$14.02$0.00
ELECTRICIAN$17.36$3.07
FORM WORKER$16.08$3.48
GLAZIER$18.16$0.87
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)$15.41$2.60
IRONWORKER, STRUCTURAL$18.75$5.62
LABORER: Common or General$12.54$2.22
LABORER: Landscape & Irrigation$10.29$1.82
LABORER: Mason Tender-Brick/Cement/Concrete$11.31$0.00
OPERATOR: Backhoe/Excavator/Trackhoe$17.98$0.91
OPERATOR: Crane$19.25$2.37
OPERATOR: Grader/Blade$15.71$1.49
OPERATOR: Loader$15.44$1.15
PAINTER: Brush, Roller and Spray$14.60$1.97
PLUMBER, Excludes HVAC Unit Installation$17.42$2.29
ROOFER$13.55$0.80
SHEET METAL WORKER (HVAC Duct Installation Only)$15.29$0.00
SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation$13.09$1.28
TRUCK DRIVER: Dump Truck$13.14$1.01

Related Wage Determinations

View directory →