Skip to content
Davis-Bacon

MT20260078 (Rev 2)

Coverage: Montana • Lake, Lincoln, Mineral +2.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ELECTRICIAN$40.71$17.94
IRONWORKER: REINFORCING AND STRUCTURAL$32.08$29.06
TRUCK DRIVER: DUMP TRUCK$18.84$5.92
OPERATOR: LOADER (FRONT END)$24.20$7.84
OPERATOR: GRADER/BLADE$24.69$8.40
OPERATOR: EXCAVATOR$22.94$9.05
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$21.99$8.55
OPERATOR: BACKHOE$21.44$8.05
LABORER: LANDSCAPE AND IRRIGATION$15.14$1.30
LABORER: PIPELAYER$21.81$4.83
LABORER: COMMON OR GENERAL$17.99$5.90
CARPENTER, EXCLUDES FORM WORK$21.13$7.00
CARPENTER (FORM WORK ONLY)$24.30$7.80

Related Wage Determinations

View directory →