Davis-Bacon
MT20260031 (Rev 0)
Coverage: Montana • Fergus.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Heat and Frost Insulator | $43.81 | $21.87 |
| BOILERMAKER | $38.75 | $32.31 |
| BRICKLAYER | $33.11 | $17.18 |
| POWER EQUIPMENT OPERATOR: (1) A-frame truck Crane | $21.51 | $16.20 |
| Cranes 25-44 tons | $38.00 | $16.20 |
| Cranes 45-74 tons | $38.00 | $16.20 |
| Cranes 75 to 144 tons, whirley cranes | $40.00 | $16.20 |
| for every 100 tons over 250 tons); Crane, Tower (all) | $42.00 | $16.20 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $36.83 | $25.30 |
| PIPEFITTER, Excludes HVAC Pipe Installation | $44.35 | $21.87 |
| SPRINKLER FITTER (Fire Sprinklers) | $39.97 | $24.40 |
| SHEET METAL WORKER (HVAC Duct Installation Only) | $40.00 | $22.07 |
| CARPENTER, Includes Drywall Hanging (Excludes Form Work) | $22.69 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.27 | $1.50 |
| ELECTRICIAN (Low Voltage Wiring for Alarms) | $20.22 | $6.58 |
| FORM WORKER | $16.02 | $6.00 |
| LABORER: Common or General | $17.93 | $3.81 |
| LABORER: Mason Tender - Brick | $18.37 | $5.94 |
| OPERATOR: Excavator | $22.98 | $5.57 |
| OPERATOR: Forklift | $21.44 | $8.05 |
| PAINTER: Brush, Roller and Spray | $19.18 | $0.00 |
| PLUMBER (HVAC Pipe Installation) | $25.75 | $10.87 |
| PLUMBER, Excludes HVAC Pipe Installation | $26.34 | $10.30 |
| ROOFER | $15.44 | $1.81 |
| TRUCK DRIVER: Dump Truck | $18.88 | $4.66 |