Skip to content
Davis-Bacon

MO20260008 (Rev 1)

Coverage: Missouri • Cedar.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR$31.97$14.00
TILE SETTER$26.47$14.89
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION$29.50$21.50
ELECTRICIAN (LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS ONLY)$32.25$20.81
MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY$60.69$38.44
POWER EQUIPMENT OPERATOR: ROLLER$30.91$18.07
POWER EQUIPMENT OPERATOR: GRADER/BLADE$31.62$18.07
POWER EQUIPMENT OPERATOR: BULLDOZER$31.62$18.07
POWER EQUIPMENT OPERATOR: (LOADER)$31.62$18.07
IRONWORKER: REINFORCING AND STRUCTURAL$36.00$34.25
LABORER (LANDSCAPE)$26.50$13.18
LABORER (BRICK MASON TENDER)$28.00$13.18
PAINTER: DRYWALL FINISHING/TAPING ONLY (DADE, DOUGLAS, HICKORY, OZARK, ST. CLAIR, STONE, & TANEY COUNTIES)$25.79$15.35
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$39.35$15.72
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION$39.35$15.72
ROOFER$30.73$14.51
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$34.43$17.86
TRUCK DRIVER: DUMP TRUCK$28.92$0.00
PAINTER: SPRAY$18.79$8.12
OPERATOR: WATER TRUCK$28.37$0.00
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.47$0.00
OPERATOR: BACKHOE/TRACKHOE$23.55$7.47
LABORER: COMMON OR GENERAL$20.44$0.00
GLAZIER$22.71$0.00
ELECTRICIAN$20.72$8.93
CEMENT MASON/CONCRETE FINISHER$17.95$6.64
BRICKLAYER$30.75$0.50

Related Wage Determinations

View directory →